For investors
384 Ukrainian projects looking for capital, from solar plants and processing facilities to logistics hubs and defence technology. Each card shows the financing required, total budget, stage, region and ownership.
384
projects in the catalogue
84
USD bn of financing required
11
sectors
21
Ukrainian oblasts
How to use the catalogue
- Narrow the list by sector, region, investment size and stage. Search finds projects by name or keyword, such as “biomethane” or “elevator”.
- Click “Discuss with IIO” on a project card. The form at the bottom of the page fills in automatically, so you only add your contact details.
- We check that the data is current, send the materials available and, if the project fits, set up a meeting with the sponsor.
Project information was provided by the project sponsors. Financial figures are preliminary; IIO verifies them together with the documents during due diligence before recommending a project to an investor.
How IIO sources projects for investors →
Looking for an investor for your project? →
Projects
No projects match these filters. Change the criteria or write to us and we will find projects for your mandate.
EnergyNo. 1.1
Flagship project
DTEK Poltava wind farm, 650 MW
A 650 MW onshore wind farm in Poltava region that will produce more than 2 TWh a year, enough for about a million homes, and ease the region's power shortage.
- Financing required
- $1.26B
- Total budget
- $1.4B
- Stage
- Under implementation
- Ownership
- Private
- Region
- Poltava Oblast
EnergyNo. 1.2
Dniester HPP, third phase
New highly flexible generating units that complete the expansion of the 972 MW Dniester hydropower plant.
- Financing required
- $1.25B
- Total budget
- $1.25B
- IRR
- 21.6%
- Payback
- 9.3 yrs
- Stage
- Under implementation
- Ownership
- Public
- Region
- Chernivtsi Oblast
EnergyNo. 1.3
Flagship project
Smart grids for Ukrainian cities
Modular battery storage of 80 to 300+ MW per city to protect critical municipal infrastructure. Municipalities pay no upfront CAPEX: a private investment company finances the systems under an operating lease and recovers costs through electricity market trading and arbitrage.
- Financing required
- $5B
- Total budget
- $5B
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Ukraine, multiple regions
EnergyNo. 1.4
Compressor station reconstruction, Ivano-Frankivsk region
New protected capacity at the compressor station (4 gas pumping units of 16 MW, 64 MW in total) to keep about 64 million m³ of gas a day flowing and cut wartime risk.
- Financing required
- $135M
- Total budget
- $135M
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Ivano-Frankivsk Oblast
EnergyNo. 1.5
Flagship project
Plakhtiivka energy complex
An integrated complex with 460 MW of wind, 460 MW of solar and a 200 MWh battery storage system.
- Financing required
- $791M
- Total budget
- $1.05B
- IRR
- 19%
- Payback
- 6 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.6
Ovid North wind farm
A 66 MW extension of the operating 32 MW Ovid wind plant near Odesa, built for quick deployment on a site with strong wind.
- Financing required
- $71.3M
- Total budget
- $97M
- IRR
- 18%
- Payback
- 7 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.7
3D seismic fleet for Ukrgazvydobuvannya
High-tech equipment for an in-house 3D seismic team covering 1,500 km² a year, to speed up new discoveries and open the way to geothermal, CO₂ and hydrogen projects.
- Financing required
- $37.8M
- Total budget
- $37.8M
- IRR
- 35%
- Payback
- 7 yrs
- Stage
- Concept
- Ownership
- Public
- Region
- Dnipropetrovsk Oblast, Ivano-Frankivsk Oblast, Lviv Oblast, Poltava Oblast, Kharkiv Oblast
EnergyNo. 1.8
Compressor station reconstruction, Lviv region
An 18 MW compressor shop (3 × 6 MW) that raises gas import and reverse flow from Poland to 20 million m³ a day.
- Financing required
- $112M
- Total budget
- $112M
- IRR
- 23%
- Payback
- 9.5 yrs
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Lviv Oblast
EnergyNo. 1.9
New gas interconnector with Romania
A two-way gas interconnector of up to 1.5 bcm a year, bringing gas, including US LNG, to Ukrainian storage and carrying exports to the EU.
- Financing required
- $75M
- Total budget
- $75M
- IRR
- 30%
- Payback
- 8 yrs
- Stage
- Concept
- Ownership
- Public
- Region
- Chernivtsi Oblast
EnergyNo. 1.10
Wind of Independence: Petrivska WPP, 93 MW
A 93 MW wind farm of 15 turbines. The 18.6 MW first stage is funded and runs from 2026; financing is sought for stages 2 and 3 (about 74.4 MW).
- Financing required
- $113.3M
- Total budget
- $141.4M
- IRR
- 12%
- Payback
- 7.1 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kirovohrad Oblast
EnergyNo. 1.11
Flagship project
Kaniv pumped storage power plant
A new 1,000 MW pumped storage plant producing 1.97 billion kWh a year, making the grid more flexible and easing renewable integration.
- Financing required
- $1.98B
- Total budget
- $1.98B
- IRR
- 6.4%
- Payback
- 19.8 yrs
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Cherkasy Oblast
EnergyNo. 1.12
Semenivka solar plant, 12.5 MWp
A grid-connected 12.5 MWp solar plant with 4 MWh of storage in Kyiv region, the first phase of a pipeline of more than 60 MWp, producing about 15.1 GWh a year.
- Financing required
- $14.8M
- Total budget
- $15.9M
- IRR
- 16.5%
- Payback
- 7 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.13
Biomethane complex with CO₂ capture
A large plant in Semypolky, Kyiv region, producing biomethane and liquefied CO₂.
- Financing required
- $19.9M
- Total budget
- $36.4M
- IRR
- 26%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.14
KGG biomethane plant
A biomethane plant of 3.7 million m³ a year running on poultry manure and corn silage, producing 14,381 MWh annually for export to the EU gas grid.
- Financing required
- $8.6M
- Total budget
- $15.7M
- IRR
- 17.5%
- Payback
- 8.2 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Poltava Oblast
EnergyNo. 1.15
Biogas from distillery waste
A biogas and biomethane unit that turns distillery residue and farm waste into energy for an alcohol plant and produces bio-fertiliser.
- Financing required
- $8.5M
- Total budget
- $16.3M
- IRR
- 22%
- Payback
- 3.8 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Vinnytsia Oblast
EnergyNo. 1.16
4.9 MW ground-mounted solar plant
A 4.9 MW solar plant on a prepared 9.8 ha site, expected to generate about 7.9 GWh a year.
- Financing required
- $2M
- Total budget
- $2.8M
- IRR
- 14.9%
- Payback
- 5.1 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zakarpattia Oblast
EnergyNo. 1.17
Mobile skid-mounted gas distribution units
Thirteen mobile automated gas distribution units with a combined 660,000 m³/h, kept as a quick reserve to replace damaged stationary stations.
- Financing required
- $27M
- Total budget
- $27M
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Ukraine, multiple regions
EnergyNo. 1.18
Flagship project
Khmelnytskyi NPP units 3 and 4
Two units with a combined 2,094 MW and 15.4 billion kWh of extra annual output. VVER-1000 reactors allow faster completion at lower cost. Unit 3 is 75% complete, unit 4 is 28%.
- Financing required
- $3.31B
- Total budget
- $6.63B
- IRR
- 21.4%
- Payback
- 13.4 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Khmelnytskyi Oblast
EnergyNo. 1.19
Lviv wind farm, 100 MW
A 100 MW wind project with up to 24 high-capacity turbines and its own infrastructure, producing 210–260 GWh a year; construction permits expected in Q1 2026.
- Financing required
- $176.1M
- Total budget
- $234.8M
- IRR
- 12%
- Payback
- 8 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Lviv Oblast
EnergyNo. 1.20
Brody–Adamowo oil pipeline
A 397 km two-way oil pipeline (700 mm, 10–20 million tonnes a year) with SCADA, linking the Ukrainian and Polish oil networks.
- Financing required
- $645.4M
- Total budget
- $645.4M
- IRR
- 9.7%
- Payback
- 12.8 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Volyn Oblast, Lviv Oblast
EnergyNo. 1.21
8.5 MWp solar plant with 34 MWh storage
A hybrid solar and battery asset in Cherkasy region: a 0.7 MW first phase in operation and a fully permitted 7.8 MW second phase with 34 MWh of storage ready to build.
- Financing required
- $10.4M
- Total budget
- $11.4M
- IRR
- 24.2%
- Payback
- 6 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Cherkasy Oblast
EnergyNo. 1.22
Sukhodoly West wind farm
An onshore wind farm in western Ukraine with 60 MW of storage potential, producing about 433 GWh a year to steady the regional grid.
- Financing required
- $163.6M
- Total budget
- $218.1M
- IRR
- 16.7%
- Payback
- 7 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Volyn Oblast
EnergyNo. 1.23
Atlas wind park
A 160 MW onshore wind farm in central Ukraine with Vestas turbines, producing 496.3 GWh a year over a 35-year life.
- Financing required
- $230.6M
- Total budget
- $307.4M
- IRR
- 17.7%
- Payback
- 7 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.24
Lymanska WPP, 158.6 MW
A new 158.6 MW wind plant by Elementum Energy Group, ready to build since Q1 2025.
- Financing required
- $150M
- Total budget
- $230M
- IRR
- 15%
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.25
Danube Spring wind project, 53.1 MW
A ready-to-build 53.1 MW wind project in Odesa region, producing up to about 190 GWh of clean power a year.
- Financing required
- $60M
- Total budget
- $93.5M
- IRR
- 15+%
- Payback
- 7 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.26
Brody–Zawadówka product pipeline
A two-way fuel pipeline of about 197 km (273 mm; 126 km in Ukraine, 71 km in Poland) along the Brody–Adamowo route to the Zawadówka depot, expanding cross-border fuel logistics and storage.
- Financing required
- $60.5M
- Total budget
- $60.5M
- IRR
- 38.1%
- Payback
- 5.2 yrs
- Stage
- Concept
- Ownership
- Public
- Region
- Lviv Oblast
EnergyNo. 1.27
5 MW solar plant, Pavlohrad district
A 5 MW solar plant on a private 10 ha plot with finished detailed design, a grid connection agreement and a built-in 5 MW battery, producing about 6.4 GWh a year.
- Financing required
- $3.9M
- Total budget
- $5.6M
- IRR
- 8%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.28
Hydraulic fracturing fleet expansion
More in-house fracturing equipment for Ukrgazvydobuvannya to meet growing demand for reservoir stimulation where local oilfield services fall short.
- Financing required
- $14.3M
- Total budget
- $14.3M
- IRR
- 21.9%
- Payback
- 8 yrs
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Ukraine, multiple regions
EnergyNo. 1.29
Three biomethane plants in western Ukraine
Three plants on livestock waste producing 9 million m³ of biomethane a year in total, plus a 2 MW grid-connected generator and 198,000 tonnes of organic fertiliser a year.
- Financing required
- $23.6M
- Total budget
- $35.9M
- Payback
- 8 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Rivne Oblast, Ternopil Oblast, Khmelnytskyi Oblast
EnergyNo. 1.30
3 MW industrial biogas plant
A 3 MW biogas plant on corn silage that sells power to the grid and supplies heat for local production.
- Financing required
- $7.2M
- Total budget
- $9.2M
- IRR
- 14.4%
- Payback
- 6.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Chernihiv Oblast
EnergyNo. 1.31
15 MW solar plant with 60 MWh storage at Novo industrial park
A 15 MW solar plant with a 60 MWh battery at the Novovolynsk industrial park, serving local industry and the wholesale market.
- Financing required
- $20M
- Total budget
- $21.3M
- IRR
- 15.3%
- Payback
- 9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Volyn Oblast
EnergyNo. 1.32
Distributed gas-fired generation, stage 1
A 30 MW network of gas-fired generators of 1–3 MW each, selling flexible power on the day-ahead market.
- Financing required
- $15M
- Total budget
- $25M
- IRR
- 30%
- Payback
- 4.1 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Volyn Oblast
EnergyNo. 1.33
Snovsk-1 solar plant with storage, 5 MW
A 5 MW ground-mounted solar plant with electricity storage on a company-owned 6,275 m² plot.
- Financing required
- $6.7M
- Total budget
- $6.7M
- IRR
- 15%
- Payback
- 9.6 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Chernihiv Oblast
EnergyNo. 1.34
Five coiled tubing fleets
Five coiled tubing units for Ukrgazvydobuvannya to support workovers, production enhancement and post-drilling commissioning as drilling grows.
- Financing required
- $24.9M
- Total budget
- $24.9M
- IRR
- 24.6%
- Payback
- 7 yrs
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Ukraine, multiple regions
EnergyNo. 1.35
24 MW solar plant and 20 MWh storage at Kryvyi Rih Cement
A 24 MW solar plant producing about 31 GWh a year, paired with a 10 MW / 20 MWh battery, to make the cement plant fully energy-independent.
- Financing required
- $11.5M
- Total budget
- $16.5M
- IRR
- 23%
- Payback
- 8.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.36
Sunflower husk cogeneration, 10 MW
A 10 MW biomass steam-turbine cogeneration plant fuelled by sunflower husk, producing about 75 GWh of clean electricity a year.
- Financing required
- $16.8M
- Total budget
- $21.1M
- IRR
- 18.4%
- Payback
- 8.7 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Vinnytsia Oblast
EnergyNo. 1.37
Protected oil tanks
Six protected underground reinforced-concrete tanks of 10,000 m³ each, built in two phases, to restore oil network capacity, add routes and secure supply to the EU.
- Financing required
- $34.2M
- Total budget
- $34.2M
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Lviv Oblast
EnergyNo. 1.38
Underground petroleum storage reconstruction
Existing underground caverns adapted for safe petroleum storage, with buffer tanks, rail loading racks and other surface infrastructure.
- Financing required
- $42.8M
- Total budget
- $42.8M
- IRR
- 82.2%
- Payback
- 3.5 yrs
- Stage
- Concept
- Ownership
- Public
- Region
- Poltava Oblast
EnergyNo. 1.39
H2U Hydrogen Valley Reni
A green hydrogen hub in Reni with 120 MW of solar and 80 MW of wind, producing 21,456 tonnes of hydrogen a year for European markets.
- Financing required
- $344.6M
- Total budget
- $344.6M
- IRR
- 11.4%
- Payback
- 5.9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.40
Gas compressor replacement at Ukrnafta gas processing plants
Full replacement of outdated gas-engine compressors in 6 workshops at 3 gas processing plants, for higher efficiency, less downtime and lower emissions.
- Financing required
- $237.3M
- Total budget
- $296.6M
- IRR
- 25.2%
- Payback
- 7.7 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Ivano-Frankivsk Oblast, Sumy Oblast, Chernihiv Oblast
EnergyNo. 1.41
100 MW hydrogen electrolysis plant, western Ukraine
A 100 MW electrolysis plant with its own renewables (about 148 MW solar and 132 MW wind by end-2026), targeting 60,000 tonnes of hydrogen a year by 2032.
- Financing required
- $256M
- Total budget
- $256M
- IRR
- 10%
- Payback
- 12 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
EnergyNo. 1.42
Wind Park West, 200 MW
A 200 MW wind farm where Ternopil, Lviv and Rivne regions meet, producing up to 660 GWh a year; ready to build from Q1 2026.
- Financing required
- $208M
- Total budget
- $297M
- IRR
- 15%
- Payback
- 8 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
EnergyNo. 1.43
Flagship project
650 MW combined-cycle gas plant
A flexible 650 MW CCGT plant on an existing DTEK site, providing balancing, ancillary services and frequency control.
- Financing required
- $1.2B
- Total budget
- $1.2B
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Ivano-Frankivsk Oblast
EnergyNo. 1.44
Ecofactor: independent energy hubs
A national network of 52 highway hubs with 2.5 MWp of solar, 25 MWh of storage and 1,000 AC chargers for electric trucks and buses, also supporting grid stability.
- Financing required
- $60M
- Total budget
- $76.1M
- IRR
- 15.6%
- Payback
- 7.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast, Kyiv Oblast, Mykolaiv Oblast, Odesa Oblast, Sumy Oblast, Kharkiv Oblast, Kherson Oblast
EnergyNo. 1.45
AI-powered microgrids for critical infrastructure, Kirovohrad region
A clean-energy microgrid run by AI, using nanotech-enhanced solar panels and Energy-as-a-Service and Battery-as-a-Service models.
- Financing required
- $1.8M
- Total budget
- $3.8M
- IRR
- 14%
- Payback
- 5.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kirovohrad Oblast
EnergyNo. 1.46
50 MWe flexible cogeneration in Chernihiv
A highly flexible 50 MW gas-piston complex at Chernihiv CHP to improve efficiency and financial results.
- Financing required
- $50.8M
- Total budget
- $56.4M
- IRR
- 9.1%
- Payback
- 8 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Chernihiv Oblast
EnergyNo. 1.47
The Oaktree Ukraine
Custom biochar plants running on biomass and solid waste, providing local power, water treatment and industrial CO₂ capture.
- Financing required
- $762.2M
- Total budget
- $1.1B
- IRR
- 19%
- Payback
- 5.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
EnergyNo. 1.48
Flexible power generation, 90 MW
A 90 MW hybrid system: 60 MW of gas-piston units for round-the-clock baseload and a 30 MW solar plant.
- Financing required
- $50M
- Total budget
- $77M
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.49
Flexible power generation, 75 MW
A 75 MW hybrid system (60 MW gas-piston, 15 MW solar) covering up to 60% of a factory's demand and keeping it running during outages.
- Financing required
- $40M
- Total budget
- $62M
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.50
Solar plant 22.6 MW AC with 40 MWh storage
A utility-scale solar project with secured grid connection and land lease: 22.6 MW AC producing about 37.5 GWh a year, plus a 10 MW / 40.1 MWh battery.
- Financing required
- $17.2M
- Total budget
- $24.5M
- IRR
- 15.2%
- Payback
- 10.9 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Lviv Oblast
EnergyNo. 1.51
Solar plant 7.2 MW AC with 30 MWh storage
A utility-scale solar project with secured grid connection and land lease: 7.2 MW AC producing about 10.8 GWh a year, plus a 7.7 MW / 30.09 MWh battery.
- Financing required
- $7.9M
- Total budget
- $11.3M
- IRR
- 17%
- Payback
- 8.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.52
Agropellet cogeneration plant
A biomass cogeneration plant built by an agropellet producer to generate electricity and heat on site.
- Financing required
- $3.5M
- Total budget
- $3.5M
- IRR
- 15.9%
- Payback
- 8.9 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Mykolaiv Oblast
EnergyNo. 1.53
Tyshivnytsia wind farm, 8 MW, Lviv region
An 8 MW wind plant of 4 turbines on pre-developed, fully permitted sites with secured grid access, producing up to about 23.5 GWh a year.
- Financing required
- $8.4M
- Total budget
- $8.6M
- IRR
- 16.5%
- Payback
- 6.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Lviv Oblast
EnergyNo. 1.54
Biomethane plant, Oleksandriia district
A high-tech biogas and biomethane complex using the existing agricultural feedstock of Oleksandriia district.
- Financing required
- $14M
- Total budget
- $19M
- IRR
- 11%
- Payback
- 8.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kirovohrad Oblast
EnergyNo. 1.55
Solar-wind plant with storage, Mykolaiv region
A 4 MW hybrid plant for self-consumption, designed so it can grow to 10 MW.
- Financing required
- $5.4M
- Total budget
- $6M
- IRR
- 22.6%
- Payback
- 5.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Mykolaiv Oblast
EnergyNo. 1.56
Battery storage 4.2 MW / 20.06 MWh
An industrial battery of 4.2 MW / 20.06 MWh for price arbitrage on the day-ahead and balancing markets and for ancillary services.
- Financing required
- $2.7M
- Total budget
- $3.8M
- IRR
- 15.6%
- Payback
- 10.2 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.57
Hrechani Pody solar plant
A 153.3 MW solar plant with a 105 MW / 215 MWh battery, forecast to produce 190.3 GWh a year.
- Financing required
- $105.6M
- Total budget
- $117.5M
- IRR
- 20%
- Payback
- 7.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.58
Battery storage 33.28 MW / 145.44 MWh
An industrial battery of 33.28 MW / 145.44 MWh for price arbitrage on the day-ahead and balancing markets and for ancillary services.
- Financing required
- $25.7M
- Total budget
- $36.6M
- IRR
- 14.8%
- Payback
- 12.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Zhytomyr Oblast
EnergyNo. 1.59
Ekokrai solar plant
A 4.4 MW solar plant with a 4 MW / 10 MWh battery in Dnipropetrovsk region, forecast to produce about 5.6 GWh a year.
- Financing required
- $4.4M
- Total budget
- $4.9M
- IRR
- 15.9%
- Payback
- 10.4 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.60
Khmelnytskyi wind farm, 40 MW
A 40 MW wind farm in Khmelnytskyi region, to be built within two years to help restore the grid.
- Financing required
- $7.9M
- Total budget
- $49M
- IRR
- 27%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Khmelnytskyi Oblast
EnergyNo. 1.61
Network of 1 MW solar plants with storage, central Ukraine
Ten 1 MW solar plants across Kyiv, Cherkasy, Vinnytsia and Chernihiv regions, each with a 2 MW battery.
- Financing required
- $48M
- Total budget
- $59M
- IRR
- 13.5%
- Payback
- 7.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Vinnytsia Oblast, Kyiv Oblast, Cherkasy Oblast, Chernihiv Oblast
EnergyNo. 1.62
Kamianets-Podilskyi battery storage, 50 MW
A 50 MW / 200 MWh utility-scale battery near Kamianets-Podilskyi for trading on all electricity market segments.
- Financing required
- $22M
- Total budget
- $30.3M
- IRR
- 28.2%
- Payback
- 4.8 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Khmelnytskyi Oblast
EnergyNo. 1.63
Rooftop solar and storage at Kovel Porto industrial park
A 10 MWp rooftop solar plant with a 10 MW / 40 MWh battery, supplying the industrial park and offering grid balancing.
- Financing required
- $34.9M
- Total budget
- $34.9M
- IRR
- 28%
- Payback
- 4.9 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Volyn Oblast
EnergyNo. 1.64
Zhdeniievo wind farm, 93.6 MW
An onshore wind project in Zakarpattia region, part of a 1.5 GW cluster, producing about 330 GWh a year for regional energy security.
- Financing required
- $104.5M
- Total budget
- $149.3M
- IRR
- 16.8%
- Payback
- 6.1 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zakarpattia Oblast
EnergyNo. 1.65
Hostra wind farm
A 67.6 MW wind farm in Zakarpattia producing about 240 GWh a year, a core part of a planned 1.5 GW regional wind cluster.
- Financing required
- $76.5M
- Total budget
- $109.3M
- IRR
- 17.8%
- Payback
- 5.9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zakarpattia Oblast
EnergyNo. 1.66
Ust-Chorna West wind farm
A 176.8 MW wind farm in Zakarpattia within the planned 1.5 GW regional wind cluster, adding local green generation.
- Financing required
- $247.2M
- Total budget
- $353.2M
- IRR
- 16.8%
- Payback
- 6.2 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zakarpattia Oblast
EnergyNo. 1.67
Kremenchuk oil refinery modernisation
A full upgrade of Ukraine's largest refinery, raising crude throughput from 6 to 11 million tonnes a year and refining depth above 95%.
- Financing required
- $2.8B
- Total budget
- $3.5B
- IRR
- 13.6%
- Payback
- 22.6 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Poltava Oblast
EnergyNo. 1.68
Risk service contracts for brownfield UN/UGV fields
Drilling and commissioning 37 conventional wells under risk service contracts to produce 1.6 bcm of gas and 325,000 tonnes of oil.
- Financing required
- $130M
- Total budget
- $150M
- IRR
- 73%
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Dnipropetrovsk Oblast, Ivano-Frankivsk Oblast, Lviv Oblast, Poltava Oblast, Kharkiv Oblast
EnergyNo. 1.69
Unconventional gas at the Oleska area, western Ukraine
A 6,324 km² greenfield area holding over 1 trillion m³ of unconventional gas; plans include 8 new wells and 5 sidetracks.
- Financing required
- $80M
- Total budget
- $100M
- IRR
- 34.6%
- Payback
- 6.8 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Ivano-Frankivsk Oblast, Lviv Oblast, Ternopil Oblast
EnergyNo. 1.70
Gas turbine power generation
Gas turbines running on the company's own gas, adding up to 250 MW of electricity for the market and heat for the local community.
- Financing required
- $69.8M
- Total budget
- $381.7M
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.71
Production sharing agreements for 8 Ukrnafta fields
Experienced partners are invited under PSAs to invest in 8 of the most promising fields chosen from Ukrnafta's 93 licences.
- Financing required
- $79.8M
- Total budget
- $79.8M
- Payback
- 6.1 yrs
- Ownership
- Public
- Region
- Ukraine, multiple regions
EnergyNo. 1.72
Flagship project
Khmelnytskyi NPP units 5 and 6, AP1000
Two units based on AP1000 technology with a design capacity of 2,294 MW, built for higher safety and efficiency.
- Financing required
- $7.73B
- Total budget
- $15.46B
- IRR
- 14.9%
- Payback
- 7.3 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Khmelnytskyi Oblast
EnergyNo. 1.73
Nuclear fuel assembly manufacturing complex
A production line in Ukraine for components of finished nuclear fuel assemblies, using Westinghouse technology.
- Financing required
- $145M
- Total budget
- $190M
- IRR
- 19.9%
- Payback
- 8.5 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Mykolaiv Oblast
EnergyNo. 1.74
330 kV Pobuzka–Talne–Poliana transit line
A new 330 kV overhead line with a total route of 235.8 km to make power supply more reliable and the grid more resilient.
- Financing required
- $131.4M
- Total budget
- $133M
- IRR
- 41%
- Payback
- 6.6 yrs
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Kirovohrad Oblast, Mykolaiv Oblast, Cherkasy Oblast
EnergyNo. 1.75
Critical equipment replacement at underground gas storage
Replacement of 5 critical gas compressor units (16 MW each, 80 MW in total) at Ukrainian underground storage sites.
- Financing required
- $159M
- Total budget
- $159M
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Ukraine, multiple regions
EnergyNo. 1.76
Battery storage 23.76 MW / 110.33 MWh
A 23.76 MW / 110.33 MWh battery for price arbitrage on the day-ahead and balancing markets and for ancillary services.
- Financing required
- $16.7M
- Total budget
- $23.8M
- IRR
- 16.1%
- Payback
- 12.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.77
Mykolaiv CHP reconstruction
New heavy-duty cogeneration units (about 81 MW electric, 63 Gcal/h heat) to cover peak load, producing 398,500 MWh a year.
- Financing required
- $62.5M
- Total budget
- $112.3M
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Mykolaiv Oblast
EnergyNo. 1.78
Kherson CHP modernisation
A new distributed power station built on high-efficiency gas-piston units with a total of 20 MW.
- Financing required
- $17.5M
- Total budget
- $17.5M
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Kherson Oblast
EnergyNo. 1.79
Berezivka WPP, phase 1, 57.6 MW
A 57.6 MW onshore wind plant in Odesa region producing about 214 GWh a year; a 90 MW second phase is also in progress.
- Financing required
- $77.5M
- Total budget
- $94.2M
- IRR
- 33.9%
- Payback
- 7.7 yrs
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Odesa Oblast
EnergyNo. 1.80
Berezivka WPP, phase 2, 90 MW
A 90 MW extension of the Berezivka wind plant producing about 334 GWh of clean power a year.
- Financing required
- $117.3M
- Total budget
- $140.2M
- IRR
- 39.7%
- Payback
- 5.8 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Odesa Oblast
EnergyNo. 1.81
Ecofield Solotvyno pilot geothermal plant
A 5 MWe / 20 MWth pilot geothermal plant in Zakarpattia producing 32.85 GWh of electricity and 133 Gcal of heat a year for industry and farming.
- Financing required
- $30.7M
- Total budget
- $37M
- IRR
- 39%
- Payback
- 7.3 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Zakarpattia Oblast
EnergyNo. 1.82
Flagship project
Unconventional gas in the Dnipro-Donets Basin
Development of unconventional gas with 300 bcm of reserves, geologically similar to fields in the US and Canada. The plan is about 1,000 horizontal wells using hydraulic fracturing, plug-and-perf and snubbing.
- Financing required
- $18.3B
- Total budget
- $18.3B
- IRR
- 40%
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Dnipropetrovsk Oblast, Poltava Oblast, Kharkiv Oblast
EnergyNo. 1.83
Deep hydrocarbon extraction plant at Khrestyshchenska BCS
A low-temperature condensation plant processing 12 million m³ of raw gas a day into up to 120,000 tonnes of LPG and 13,000 tonnes of stable condensate a year.
- Financing required
- $120M
- Total budget
- $120M
- IRR
- 26%
- Payback
- 7 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Kharkiv Oblast
EnergyNo. 1.84
Offshore Black Sea licences
Exploration and production on shallow and deep-water Black Sea licences with 340 bcm of resources, aiming for peak output of up to 10 bcm a year.
- Financing required
- $4B
- Total budget
- $4B
- IRR
- 37.2%
- Payback
- 9.6 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Ukraine, multiple regions
EnergyNo. 1.85
Gas-piston units at CNG filling stations, pilot
18 highly flexible gas-piston units (about 45.7 MW) at 4 CNG stations, producing up to 270 GWh of power and 121,000 Gcal of heat a year.
- Financing required
- $38M
- Total budget
- $45M
- IRR
- 22%
- Payback
- 8.9 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Kyiv Oblast
EnergyNo. 1.86
GreenWest PtX: 500 MW renewable hydrogen cluster
A Power-to-X project near the EU border with 500 MW of electrolysers and 1 GW of renewables, producing 50,000 tonnes of green hydrogen a year for export.
- Financing required
- $250M
- Total budget
- $2B
- IRR
- 15%
- Payback
- 15 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Volyn Oblast
EnergyNo. 1.87
Central European Hydrogen Corridor
A two-way pipeline for pure green hydrogen with a design capacity of 1.5 million tonnes a year, linking Ukrainian supply to Central European markets.
- Financing required
- $398M
- Total budget
- $398M
- IRR
- 20%
- Payback
- 8 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Ukraine, multiple regions
EnergyNo. 1.88
Medium- and high-voltage cable production upgrade
A continuous catenary vulcanisation line for XLPE cables that triples output and secures supply for the grid.
- Financing required
- $9.6M
- Total budget
- $12.6M
- IRR
- 31.4%
- Payback
- 4.9 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.89
Wind and solar project, Lviv region
A hybrid project with 55 MW of wind and 30 MW of solar near the Polish border, producing about 181 GWh a year.
- Financing required
- $126M
- Total budget
- $157M
- IRR
- 6.8%
- Payback
- 14.8 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
EnergyNo. 1.90
Alternative-fuel CHP plant in Zhytomyr
A turnkey CHP plant (9.9–13.1 MW electric, up to 22 MW heat) on wood chips and SRF, producing about 78.5 GWh of electricity and 84,500 Gcal of heat a year.
- Financing required
- $75M
- Total budget
- $75M
- IRR
- 16.4%
- Payback
- 7.2 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Zhytomyr Oblast
EnergyNo. 1.91
Heat pumps and cogeneration at Zhytomyr's RK-6 boiler house
Two heat pumps and a 1.56 MW cogeneration unit added to the RK-6 boiler house to supply 21,880 Gcal of heat a year to Zhytomyr.
- Financing required
- $6.1M
- Total budget
- $6.1M
- IRR
- 16.2%
- Payback
- 5.9 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Zhytomyr Oblast
EnergyNo. 1.92
On-site solar plant at ArcelorMittal Kryvyi Rih, 28 MW
A 28 MW solar plant on 26.9 ha inside the steelworks, connected straight to its grid and producing about 33.5 GWh a year.
- Financing required
- $15.5M
- Total budget
- $15.5M
- IRR
- 15.7%
- Payback
- 19 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.93
Wind power plant, 245 MW
A ready-to-build onshore wind and storage project producing 578 GWh a year for critical community needs.
- Financing required
- $386.4M
- Total budget
- $386.4M
- IRR
- 17.9%
- Payback
- 18 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.94
Chudniv battery storage pilot
A stand-alone 20 MW / 110 MWh battery at an existing solar plant site for price arbitrage, with grid synchronisation planned from 2030.
- Financing required
- $13.5M
- Total budget
- $16.9M
- IRR
- 43%
- Payback
- 5.1 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Zhytomyr Oblast
EnergyNo. 1.95
Biomass pellets for industry
A 4,000 m² plant turning biomass into fuel pellets (2,000 tonnes a month) with an integrated 1 MW unit.
- Financing required
- $4.7M
- Total budget
- $6.7M
- IRR
- 23%
- Payback
- 3.9 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Chernihiv Oblast
EnergyNo. 1.96
H2U Hydrogen Valley Reni: e-methanol
A renewable methanol hub in Reni with 120 MW of solar, 80 MW of wind and storage, producing 83,064 tonnes of green methanol a year for export.
- Financing required
- $397.8M
- Total budget
- $397.8M
- IRR
- 9.8%
- Payback
- 6.4 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.97
H2U Hydrogen Valley Reni: renewable ammonia
A renewable ammonia hub in Reni with 120 MW of solar and 80 MW of wind, producing 120,800 tonnes of green ammonia a year for export.
- Financing required
- $610.2M
- Total budget
- $610.2M
- IRR
- 8.8%
- Payback
- 6.8 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.98
Petrovo-Solonycha floating solar plant
A 54 MW solar plant on water with a 43 MW / 86.5 MWh battery in Mykolaiv region, producing about 59 GWh a year.
- Financing required
- $41M
- Total budget
- $45.5M
- IRR
- 17.3%
- Payback
- 9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Mykolaiv Oblast
EnergyNo. 1.99
Vinnytska battery storage, 72 MW
A 72 MW / 300 MWh utility-scale battery for commercial trading across all power market segments.
- Financing required
- $36.9M
- Total budget
- $48.9M
- IRR
- 22.3%
- Payback
- 4.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Vinnytsia Oblast
EnergyNo. 1.100
Murovana wind power plant
An onshore wind project in Odesa region by KNESS, bankable and verified to produce 248.19 GWh a year.
- Financing required
- $150M
- Total budget
- $150M
- IRR
- 32%
- Payback
- 4 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.101
Vlasne Energy: 75 MW solar with 75/150 MWh storage
A 75 MW ground-mounted solar plant producing about 94 GWh a year with a 75 MW / 150 MWh battery, for energy autonomy near Kyiv and grid export.
- Financing required
- $31.9M
- Total budget
- $53.1M
- IRR
- 38.4%
- Payback
- 3.6 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.102
Hydrogen heating module for Ukrainian cities
Rooftop solar, a 1 MW PEM electrolyser and 30–40 bar storage feeding high-efficiency boilers for zero-emission home heating.
- Financing required
- $11.8M
- Total budget
- $12M
- IRR
- 19%
- Payback
- 4 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.103
SolarHubs Ukraine: Ecofactor charging hubs
About 100 standard charging hubs in residential areas of priority oblasts, combining solar, batteries and AC chargers for community resilience.
- Financing required
- $18.3M
- Total budget
- $20.3M
- IRR
- 67%
- Payback
- 1.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast, Kyiv Oblast, Mykolaiv Oblast, Odesa Oblast, Sumy Oblast, Kharkiv Oblast, Kherson Oblast
EnergyNo. 1.104
Chyhyryn community wind power plant
A 10 MW onshore wind project of five turbines in Cherkasy region, fully ready to build and producing about 30 GWh a year.
- Financing required
- $9M
- Total budget
- $11.2M
- IRR
- 28.1%
- Payback
- 4.2 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Cherkasy Oblast
EnergyNo. 1.105
Orbita solar plant with storage
A hybrid industrial energy complex: a 4.95 MW solar plant producing about 6.6 GWh a year and a 20 MWh battery.
- Financing required
- $5.2M
- Total budget
- $6.5M
- Payback
- 2.6 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Cherkasy Oblast
EnergyNo. 1.106
Wesfin grid-scale battery storage, 40 MW
A lithium-ion battery of 40 MW / 160 MWh for grid balancing, arbitrage and wholesale trading.
- Financing required
- $31M
- Total budget
- $39M
- IRR
- 24%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Mykolaiv Oblast
EnergyNo. 1.107
Novo Energy 5: solar plant with battery storage
A hybrid site in Khmelnytskyi region with an 18.32 MW solar plant and a 13 MW / 50 MWh battery for balancing and ancillary services.
- Financing required
- $15M
- Total budget
- $19M
- IRR
- 19.5%
- Payback
- 6.2 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Khmelnytskyi Oblast
EnergyNo. 1.108
175 MW wind project, Kirovohrad region
An advanced 175 MW onshore wind farm structured for institutional financing, producing about 560 GWh a year.
- Financing required
- $271M
- Total budget
- $271M
- IRR
- 13.6%
- Payback
- 8.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kirovohrad Oblast
EnergyNo. 1.109
65 MW wind project, Khmelnytskyi region
Taking an onshore wind farm to ready-to-build status, with an expected net output of about 203 GWh a year (P50).
- Financing required
- $102M
- Total budget
- $102M
- IRR
- 13.11%
- Payback
- 9 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Khmelnytskyi Oblast
EnergyNo. 1.110
77 MW wind project, Chernihiv region
Taking an onshore wind farm to ready-to-build status, with an expected net output of about 246 GWh a year (P50).
- Financing required
- $122M
- Total budget
- $122M
- IRR
- 13.2%
- Payback
- 9 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Chernihiv Oblast
EnergyNo. 1.111
Biomass boiler upgrade for energy independence
A 6 MW boiler burning agricultural husk, producing about 48 GWh of heat a year and cutting energy costs by up to 25%.
- Financing required
- $1.3M
- Total budget
- $1.5M
- IRR
- 25%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Ternopil Oblast
EnergyNo. 1.112
Polonne solar park
A 216 MW solar plant with a 150 MW / 300 MWh battery in Khmelnytskyi region.
- Financing required
- $123.7M
- Total budget
- $153.7M
- IRR
- 11%
- Payback
- 11 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Khmelnytskyi Oblast
EnergyNo. 1.113
Green Light Energy highway charging
Highway EV charging with a 5 MW battery that also serves the balancing market, targeting about 4 GWh of electricity sales a year.
- Financing required
- $10.6M
- Total budget
- $11.3M
- IRR
- 25.3%
- Payback
- 4.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.114
S Power: greenfield 151.2 MW wind farm, Cherkasy region
An onshore wind farm with 40 MW of storage potential, producing about 450 GWh a year to steady the regional grid.
- Financing required
- $160.4M
- Total budget
- $229.1M
- IRR
- 18.1%
- Payback
- 5.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Cherkasy Oblast
EnergyNo. 1.115
Odesa wind power plant
A ready-to-build onshore wind project in Odesa region producing 323 GWh a year for critical community needs.
- Financing required
- $193.2M
- Total budget
- $193.2M
- Payback
- 10 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Odesa Oblast
EnergyNo. 1.116
Vinnytsia wind power plant
A ready-to-build 252 MW wind project with 25 MW / 50 MWh of storage, producing 766 GWh a year.
- Financing required
- $484.7M
- Total budget
- $484.7M
- Payback
- 10 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Vinnytsia Oblast
EnergyNo. 1.117
DMZ solar plant in Dnipro
A 36 MWp ground-mounted solar plant on an industrial site in Dnipro, producing about 47 GWh a year.
- Financing required
- $21.6M
- Total budget
- $21.6M
- IRR
- 30%
- Payback
- 9 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
EnergyNo. 1.118
Independent power for rural schools, Kirovohrad and Vinnytsia regions
Autonomous solar systems (about 720–850 kW) and storage (1.2–1.5 MWh) for 24 rural schools, producing about 0.9 GWh a year and keeping classes running during winter blackouts.
- Financing required
- $1.4M
- Total budget
- $1.4M
- IRR
- 16.5%
- Payback
- 7.2 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kirovohrad Oblast
EnergyNo. 1.119
Dalort Brovary distributed cogeneration, phase 1 (51.6 MW)
Expanding a distributed CHP facility to 51.6 MW, with heat for Brovary's utilities and local consumers.
- Financing required
- $34M
- Total budget
- $48.5M
- IRR
- 42%
- Payback
- 2 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kyiv Oblast
EnergyNo. 1.120
Dubno battery storage, 20 MW / 40 MWh
A grid-scale battery in Rivne region providing balancing and arbitrage (about 27,700 MWh a year) on the wholesale market and making the local grid more reliable.
- Financing required
- $5.5M
- Total budget
- $7.8M
- IRR
- 51.8%
- Payback
- 3.6 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Rivne Oblast
EnergyNo. 1.121
4 MWh industrial battery with 85 kW solar
A 4 MWh industrial battery with a 1 MW inverter and an 85 kW solar plant on a secured substation site in Rivne.
- Financing required
- $1M
- Total budget
- $1.1M
- IRR
- 20.5%
- Payback
- 8.4 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Rivne Oblast
EnergyNo. 1.122
Solar Guard hybrid plant with 25 MW / 100 MWh storage
A 100 MWp hybrid solar plant with a 25 MW wind component in Cherkasy region, built in three phases by 2028 and producing over 125 GWh a year.
- Financing required
- $79M
- Total budget
- $86M
- IRR
- 27%
- Payback
- 5.3 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Cherkasy Oblast
EnergyNo. 1.223
Fuel-free generation: Expander-Generator-300 for the gas TSO
300 kW turbo-expander generators at key gas distribution stations turn pressure-reduction energy into about 2.3 million kWh of clean power a year.
- Financing required
- $1.7M
- Total budget
- $1.7M
- IRR
- 14.2%
- Payback
- 6 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast, Poltava Oblast, Kharkiv Oblast
EnergyNo. 1.224
Dymer agro-energy hub
A pilot micro smart grid with a 1 MW CHP (2,080.5 MWh a year), 1 MW of solar (918 MWh a year) and a 5 MW battery.
- Financing required
- $1.2M
- Total budget
- $1.7M
- IRR
- 75.7%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
Transport and logisticsNo. 2.1
2,000 new gondola cars
Purchase of 2,000 rail wagons to meet fast-growing demand for freight transport.
- Financing required
- $120M
- Total budget
- $150M
- IRR
- 30.7%
- Payback
- 7.9 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Transport and logisticsNo. 2.2
Class A warehouse complex
A Class A warehouse complex built in four stages, with a gross area of 66,606 m².
- Financing required
- $23.8M
- Total budget
- $34M
- Payback
- 14.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Cherkasy Oblast
Transport and logisticsNo. 2.3
Logistics hub in Zakarpattia
A multimodal transshipment terminal near the EU border: narrow-to-wide gauge container handling (32 forty-foot containers per 8 hours), truck-to-train transfer (32 operations per 8 hours), container and oversized cargo storage, and other services.
- Financing required
- $40M
- Total budget
- $50M
- IRR
- 14.9%
- Payback
- 9.2 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zakarpattia Oblast
Transport and logisticsNo. 2.4
Universal Trans-European Frontier Terminal cluster
A cross-border industrial park on the Ukraine–Poland border: a multimodal hub of up to 150,000 TEU and over 2 Mt of cargo a year, wagon repair (4,000–6,000 a year) and manufacturing (500–1,000 a year), over 5 km of dual-gauge track, and 4 MW of solar with 8 MWh of storage, linked to EU TEN-T corridors.
- Financing required
- $216M
- Total budget
- $240M
- IRR
- 15%
- Payback
- 6.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
Transport and logisticsNo. 2.5
Ukrzaliznytsia locomotive fleet upgrade
Purchase of 100 new EU-built AC electric locomotives and 40 US-built diesel freight locomotives, to keep cargo market share and support the return of Ukrainians from abroad.
- Financing required
- $866M
- Total budget
- $866M
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Kyiv
Transport and logisticsNo. 2.6
Intercity rail expansion for Ukrzaliznytsia
20 Intercity trains running at 160–200 km/h and a new depot No. 3 for medium and heavy overhaul, linking Kyiv with all major cities on electrified lines.
- Financing required
- $510M
- Total budget
- $510M
- IRR
- 2.6%
- Payback
- 35 yrs
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Kyiv
Transport and logisticsNo. 2.7
Low-cost EU–Ukraine rail passenger carrier
European-gauge trains for a low-cost carrier from Uzhhorod, Lviv and Kovel to Budapest, Bratislava, Warsaw, Vienna and Berlin.
- Financing required
- $441M
- Total budget
- $441M
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Ukraine, multiple regions
Transport and logisticsNo. 2.8
Eurolink Chernivtsi–Vadul-Siret towards Romania
A new 47 km European-gauge line from Chernivtsi to the Romanian border, part of the Baltic–Black–Aegean Sea TEN-T corridor, giving the Ukrainian network a direct link to the EU.
- Financing required
- $186M
- Total budget
- $209M
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Chernivtsi Oblast
Transport and logisticsNo. 2.9
Lisky integrated intermodal operator spin-off
A joint venture with a private logistics operator to revive intermodal infrastructure (rebuilding 5 terminals, building 2 new ones) and buy 500+ flat wagons.
- Financing required
- $100M
- Total budget
- $100M
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Dnipropetrovsk Oblast, Zakarpattia Oblast, Kyiv Oblast, Odesa Oblast, Kharkiv Oblast
Transport and logisticsNo. 2.10
European-gauge infrastructure in the Lviv rail node
A 5 km European-gauge bypass linking Lviv central station with the new gauge from Poland at Sknyliv, plus a new mixed-use passenger terminal at Sknyliv.
- Financing required
- $100M
- Total budget
- $100M
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Lviv Oblast
Transport and logisticsNo. 2.11
Chornomorsk container terminal concession
A 40-year concession at Chornomorsk sea port covering two terminals with 6 berths, container and multipurpose, for private development and operation.
- Financing required
- $49M
- Total budget
- $49M
- Stage
- Ready for implementation
- Ownership
- PPP
- Region
- Odesa Oblast
Transport and logisticsNo. 2.12
Chornomorsk ferry terminal concession
A concession of about 30 years for the rail and ferry complex, bringing private management and capital to underused terminals.
- Financing required
- $10.4M
- Total budget
- $10.4M
- Stage
- Ready for implementation
- Ownership
- PPP
- Region
- Odesa Oblast
Transport and logisticsNo. 2.13
Horonda Port multimodal terminal, Zakarpattia
An intermodal terminal on 13.8 ha with first-stage capacity of 1.5 million tonnes a year, on the Mediterranean rail freight corridor and TEN-T corridor 5, next to the 35 ha Goronda Park industrial park.
- Financing required
- $38.7M
- Total budget
- $45.6M
- IRR
- 17.3%
- Payback
- 13 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Zakarpattia Oblast
Transport and logisticsNo. 2.14
WINHUB: national network of Class A logistics parks
Ukraine's first national network of Class A logistics parks, targeting 1,000,000 m² along EU–Ukraine–Asia corridors; three parks are under way on the E40/E95 Kyiv hub and E95 Black Sea routes.
- Financing required
- $595M
- Total budget
- $700M
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast, Odesa Oblast
Transport and logisticsNo. 2.15
Grain and oil terminal in Pivdennyi port
A multipurpose marine terminal in Pivdennyi port for farm and oil exports: 5.4 Mt of grain and 0.84 Mt of oil a year, 5.0 Mt of rail intake, and berths for vessels of 35,000–100,000 DWT handling up to 6.7 Mt.
- Financing required
- $159.5M
- Total budget
- $199.4M
- IRR
- 22.4%
- Payback
- 8.1 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
Transport and logisticsNo. 2.16
Locomotive modernisation to keep units in service
Upgrading 36 existing locomotives with new technology so they do not have to be withdrawn.
- Financing required
- $65.7M
- Total budget
- $73M
- IRR
- 32%
- Payback
- 7.6 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Poltava Oblast
Transport and logisticsNo. 2.17
High-capacity grain terminal in Pivdennyi port
A grain and meal terminal in Pivdennyi port handling up to 9 million tonnes a year.
- Financing required
- $150M
- Total budget
- $200M
- IRR
- 25%
- Payback
- 10 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
Transport and logisticsNo. 2.18
Ukrainian Danube Shipping fleet modernisation
Replacing main and auxiliary engines on UDP's river cargo fleet, a cheaper way to raise performance than building new vessels.
- Financing required
- $65M
- Total budget
- $72.5M
- IRR
- 24%
- Payback
- 7 yrs
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Odesa Oblast
Transport and logisticsNo. 2.19
Chop CargoHub
European technology for safe, low-cost rail transport of semi-trailers.
- Financing required
- $25.7M
- Total budget
- $85.6M
- IRR
- 7.1%
- Payback
- 4.7 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zakarpattia Oblast, Kyiv Oblast
Transport and logisticsNo. 2.20
Dry cargo logistics hub
A logistics hub built on Allseeds Group's existing dry cargo terminal, handling 3 million tonnes a year.
- Financing required
- $118M
- Total budget
- $118M
- IRR
- 14%
- Payback
- 13 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Odesa Oblast
Transport and logisticsNo. 2.21
Deep-water grain terminal in Pivdennyi port
A modern deep-water terminal handling up to 5 million tonnes of agricultural products a year.
- Financing required
- $60M
- Total budget
- $150M
- IRR
- 17%
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
Transport and logisticsNo. 2.22
Ilarionivska logistics infrastructure
A logistics centre, fuel station and biofuel plant on a vacant plot along the E-105 highway; the site is ready for permitting.
- Financing required
- $5.7M
- Total budget
- $6M
- IRR
- 14%
- Payback
- 5.7 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Transport and logisticsNo. 2.23
Resilient Logistics Hub: West Gate redevelopment
Ukraine's first highly automated warehouse, 61,900 m² with high-bay option, on the site of a damaged complex near Kyiv with direct access to national corridors.
- Financing required
- $55M
- Total budget
- $108M
- IRR
- 11.1%
- Payback
- 10.3 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kyiv Oblast
Transport and logisticsNo. 2.24
Kovel Porto Logistics
A cross-border logistics hub in Kovel Porto industrial park, western Ukraine, offering intermodal services including container transfer between 1520 and 1435 mm gauges.
- Financing required
- $37.6M
- Total budget
- $47M
- IRR
- 23%
- Payback
- 7 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Volyn Oblast
Transport and logisticsNo. 2.25
Allseeds crushing plant and oil terminal reconstruction
Rebuilding Allseeds' multi-seed crushing plant and vegetable oil terminal in Pivdennyi port, damaged by missiles and drones. Daily capacity: 2,350 t sunflower, 1,800 t rapeseed or 1,350 t soy; storage 100,000 t; transshipment 1 Mt a year.
- Financing required
- $21M
- Total budget
- $26M
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
Transport and logisticsNo. 2.26
Multimodal logistics and export hub, Zakarpattia
Buying and upgrading a 20,000 m² customs-licensed warehouse complex on the E50, 40 km from the EU border, into a multimodal hub with stable cash flow from year one.
- Financing required
- $4.7M
- Total budget
- $4.7M
- IRR
- 17.6%
- Payback
- 7 yrs
- Stage
- Asset for sale
- Ownership
- Private
- Region
- Zakarpattia Oblast
Real estate and housingNo. 3.1
yeOselia+: scaling the affordable mortgage programme
Additional funding for the yeOselia affordable mortgage programme. Since late 2022 more than 17,000 families, including over 10,000 children, have bought homes, with loans above USD 680 million.
- Financing required
- $1.5B
- Total budget
- $2.1B
- Stage
- Under implementation
- Ownership
- Public
- Region
- Ukraine, multiple regions
Real estate and housingNo. 3.2
DOMOVA: collective sale of ageing housing
An online platform where owners in old or unsafe buildings join forces to sell the whole building as one investment. It coordinates owners, gives legal support and works with relocation partners; trademarks are registered in Ukraine, the US, UK, Moldova, Switzerland and Monaco.
- Financing required
- $2M
- Total budget
- $3M
- IRR
- 31.6%
- Payback
- 4.4 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
Real estate and housingNo. 3.3
National Unity Center, Ukrainian Catholic University
A sustainable building at UCU designed by Behnisch Architekten for the School of Lifelong Learning, hosting over 10,000 participants a year, including veterans, IDPs and civic leaders, in short practical programmes.
- Financing required
- $7.8M
- Total budget
- $11M
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Lviv Oblast
Real estate and housingNo. 3.4
Promprylad development, Ivano-Frankivsk
An impact investment project reviving a former factory in Ivano-Frankivsk as a hub for the new economy, informal education, urbanism and contemporary art; 30% of operating profit goes back into city initiatives.
- Financing required
- $29.5M
- Total budget
- $56M
- IRR
- 11%
- Payback
- 17 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ivano-Frankivsk Oblast
Real estate and housingNo. 3.5
Rozdil Palace: historic palace and cultural park
An international impact project to revive a historic palace and park on a self-sustaining business model, aiming to become Western Ukraine's largest cultural and tourist destination and the centre of the Rozdil Wonders route network.
- Financing required
- $19.2M
- Total budget
- $26.7M
- IRR
- 18.2%
- Payback
- 16 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Lviv Oblast
Real estate and housingNo. 3.6
Bila Tserkva Industrial Park development
A working, ready-to-build industrial park for Ukrainian and foreign manufacturers, seeking debt and project finance for new facilities and project finance for further parks.
- Financing required
- $165M
- Total budget
- $250M
- IRR
- 16%
- Payback
- 7 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kyiv Oblast
Real estate and housingNo. 3.7
Social housing in Kharkiv
About 4,600 social and affordable homes with a total area of 251,764 m² for over 10,000 residents: IDPs, people who lost homes in the war, doctors, scientists and students.
- Financing required
- $53M
- Total budget
- $200M
- IRR
- 48%
- Payback
- 2.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kharkiv Oblast
Real estate and housingNo. 3.8
Innovation Forpost Industrial Park, Dnipro
A municipal industrial park set up in 2018 for 45 years and run by the Dnipro Development Agency, seeking debt finance and grants for infrastructure.
- Financing required
- $21.4M
- Total budget
- $30.8M
- IRR
- 5.9%
- Payback
- 10 yrs
- Stage
- Under implementation
- Ownership
- Public
- Region
- Dnipropetrovsk Oblast
Real estate and housingNo. 3.9
Kryvbas Industrial Park, Kryvyi Rih
A municipal park on about 26 ha in Kryvyi Rih with room to grow to 73 ha, run by the city development institution, which supports residents at every step.
- Financing required
- $5.4M
- Total budget
- $8.85M
- IRR
- 22%
- Payback
- 6.7 yrs
- Stage
- Under implementation
- Ownership
- Public
- Region
- Dnipropetrovsk Oblast
Real estate and housingNo. 3.10
Ocean Plaza large privatisation
Privatisation of Ocean Plaza (Lybid Investment Union LLC), one of Kyiv's largest shopping and entertainment centres, named Ukraine's best large mall at the 2021 RAU Awards.
- Financing required
- on request
- Total budget
- on request
- Stage
- Asset for sale
- Ownership
- Private
- Region
- Kyiv Oblast
Real estate and housingNo. 3.11
Vlasne Misto residential cluster
A 600 ha cluster city 7 km from Kyiv with over 1.5 million m² of housing for more than 47,000 residents, the main source of demand for its energy, infrastructure and services.
- Financing required
- $23M
- Total budget
- $105M
- IRR
- 64%
- Payback
- 1.9 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
Real estate and housingNo. 3.12
Flagship project
Social rental housing
A national social rental programme for IDPs, veterans and other vulnerable groups: 52 apartment buildings housing about 6,552 families, roughly 16,000 people.
- Financing required
- $468M
- Total budget
- $474.1M
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Zhytomyr Oblast, Lviv Oblast, Mykolaiv Oblast
Real estate and housingNo. 3.13
White Star Bucha industrial and logistics park
A 41 ha park 8 km from Kyiv with about 240,000 m² GLA (225,000 m² warehouses, 15,000 m² offices) in 10 LEED Class A buildings. Phase 1, a 21,050 m² building, is in permitting; developed with Bucha City Council.
- Financing required
- on request
- Total budget
- $200M
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
Real estate and housingNo. 3.14
Kuyalnyk sanatorium
One of Ukraine's oldest mud and spa resorts, founded in 1833 on the Kuyalnyk Estuary in Odesa, with strong potential to become a national centre for medical, rehabilitation and wellness tourism.
- Financing required
- on request
- Total budget
- on request
- Stage
- Feasibility study
- Ownership
- PPP
- Region
- Odesa Oblast
Real estate and housingNo. 3.15
Schönborn Palace, Zakarpattia
A neo-Romanesque palace built in 1890–1895 as the Schönborn family residence, suited through PPP for conversion into a national-level tourism and leisure destination.
- Financing required
- on request
- Total budget
- on request
- Stage
- Feasibility study
- Ownership
- PPP
- Region
- Zakarpattia Oblast
Real estate and housingNo. 3.16
3D Ukrainian City
A cottage complex for IDPs built with 3D printing technology and fully energy-independent.
- Financing required
- $10.5M
- Total budget
- $10.6M
- IRR
- 27%
- Payback
- 4.5 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Kyiv Oblast
Real estate and housingNo. 3.17
Solomonovo Valley innovation hub
An innovation hub in Solomonovo Industrial Park, Zakarpattia, for smart mobility and robotics prototyping: a 2,082 m² lab with 3D printing, Trumpf, Chiron and Heller machines and a test bench, 8,650 m² of flexible production space, 2 t and 10 t cranes and R&D areas, open to startups and SMEs.
- Financing required
- $12M
- Total budget
- $17.1M
- IRR
- 13%
- Payback
- 7 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zakarpattia Oblast
Real estate and housingNo. 3.18
Formatsia.Vinnytsia Industrial Park
A modern industrial park in Vinnytsia supporting manufacturers and innovation.
- Financing required
- $108.8M
- Total budget
- $128M
- IRR
- 11%
- Payback
- 10.4 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Vinnytsia Oblast
IT and communicationsNo. 4.1
Flagship project
AI and HPC data centre: Ukraine Superpower Hub
500 MW of data centres powered by nuclear baseload: a 25–50 MW pilot by 2027 and over 500 MW by 2032–2035.
- Financing required
- $6B
- Total budget
- $6B
- IRR
- 15–18%
- Stage
- Concept
- Ownership
- PPP
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.2
CreaInnovations Valley: BuchaTechnoGarden industrial park
Infrastructure for tech companies and startups at the Bucha Techno Garden park, with R&D centres and clusters for technology, green building materials and creative industries.
- Financing required
- $11.7M
- Total budget
- $96.1M
- IRR
- 34.7%
- Payback
- 2.7 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kyiv Oblast
IT and communicationsNo. 4.3
CreaInnovations Valley: TOCHMASH innovation hub
A centre for agricultural technology and machinery combining R&D, production and education.
- Financing required
- $7.7M
- Total budget
- $19.3M
- IRR
- 28%
- Payback
- 3 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
IT and communicationsNo. 4.4
Rail Logistics Marketplace
A platform that connects cargo owners and forwarders much like Uber and calculates rail transport costs automatically.
- Financing required
- $1M
- Total budget
- $1.15M
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.5
PRE-ORDER
A B2B and B2C platform linking textile manufacturers with fashion brands and buyers, simplifying orders and production for a sustainable supply chain.
- Financing required
- $2.1M
- Total budget
- $3M
- IRR
- 96.8%
- Payback
- 2.8 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.6
PayKit (Horeker)
Retail software for sales accounting, customer service, receipts, card payments and online orders.
- Financing required
- $1.3M
- Total budget
- $1.8M
- IRR
- 47%
- Payback
- 4.8 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.7
5G network for Ukraine
Rolling out 5G so that 90% of the population has fast, advanced mobile connectivity.
- Financing required
- $250M
- Total budget
- $250M
- IRR
- 37%
- Payback
- 6 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.8
Telecom network resilience
Making Ukraine's telecom network much more resistant to frequent Russian physical and cyber attacks.
- Financing required
- $51M
- Total budget
- $51M
- IRR
- 29%
- Payback
- 7 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.9
Building Ukraine's AI University (KSE)
Expanding KSE's campus in Kyiv for higher and vocational education and new science and engineering labs, growing to 2,500 students by 2028.
- Financing required
- $48.5M
- Total budget
- $50M
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
IT and communicationsNo. 4.10
Grant Bridge Ukraine
A digital platform matching healthcare needs with international funders, for transparency and better planning.
- Financing required
- $1.1M
- Total budget
- $1.2M
- IRR
- 18%
- Payback
- 6.5 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.11
Acorn FreonLeaksBlock
A smart system that spots refrigerant leaks, cuts energy use and helps meet EU rules such as CBAM and ETS.
- Financing required
- $1.15M
- Total budget
- $1.2M
- IRR
- 16%
- Payback
- 3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.12
Optima Digital School Network
A scalable K-12 digital education platform for launching accredited online schools in several countries.
- Financing required
- $22.3M
- Total budget
- $31.8M
- IRR
- 35.6%
- Payback
- 5.2 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.13
KUTS: Talent Drive
An EdFinTech ecosystem that reskills workers in 2–8 weeks for reconstruction sectors, using AI career matching.
- Financing required
- $23.5M
- Total budget
- $25M
- IRR
- 38%
- Payback
- 3.5 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.14
Resilient Care Ukraine
A scalable digital mental health platform with iCBT, remote care and structured clinical pathways for PTSD and related conditions.
- Financing required
- $4.4M
- Total budget
- $5M
- IRR
- 12%
- Payback
- 2.9 yrs
- Stage
- Ready for implementation
- Ownership
- Public
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.15
Underground Tier III data centre
A secure, Tier III-certified underground data centre in a protected part of western Ukraine for commercial and national hosting.
- Financing required
- $16.8M
- Total budget
- $33.5M
- IRR
- 22.5%
- Payback
- 13 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.16
Time Interaction Management
A mobile app for managing interactions, preparing negotiations and analysing behaviour, based on DISC and Big Five, with a GDPR-aligned legal framework.
- Financing required
- $0.7M
- Total budget
- $1M
- IRR
- 28%
- Payback
- 3.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.17
Soft4trans
A platform that automates logistics workflows from route planning to documents; tested with 8 logistics firms and ready to scale.
- Financing required
- $0.5M
- Total budget
- $1M
- IRR
- 74%
- Payback
- 3 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.18
KUTS.UA
A marketplace for Ukrainian-language online learning that connects students and teachers.
- Financing required
- $1M
- Total budget
- $1.1M
- IRR
- 62%
- Payback
- 2 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.19
MINOS
A platform combining narrative intelligence, reputation management and cyber threat mitigation.
- Financing required
- $3M
- Total budget
- $4M
- IRR
- 49.9%
- Payback
- 6 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.20
WEAGRO and eDilo: B2B buy now, pay later
An embedded B2B instalment service that lets buyers purchase now and pay later, helping producers sell more and buyers manage cash flow.
- Financing required
- $85M
- Total budget
- $100M
- IRR
- 48.3%
- Payback
- 2.6 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.21
Faktorist
An AI-powered B2B trade platform linking Ukrainian manufacturers with buyers worldwide and automating export processes and negotiations.
- Financing required
- $3.24M
- Total budget
- $3.51M
- IRR
- 32%
- Payback
- 5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Lviv Oblast
IT and communicationsNo. 4.22
Command Chat
An AI business operating system that unites a company's scattered systems for search, analysis, forecasting and workflow automation, with built-in AI agents and access control.
- Financing required
- $2.5M
- Total budget
- $3M
- IRR
- 38%
- Payback
- 4 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.23
MISTO
A City-as-a-Service platform giving cities and residents a direct, trusted communication channel for safer, more resilient communities.
- Financing required
- $5.5M
- Total budget
- $8.5M
- IRR
- 34%
- Payback
- 5.1 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.24
Subjektiv
A platform building ownership infrastructure for the creative economy.
- Financing required
- $1.5M
- Total budget
- $2.5M
- IRR
- 21%
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kyiv Oblast
IT and communicationsNo. 4.25
GitMir
An AI visual development platform that builds applications up to five times faster, backed by the GitMir EdSpace learning ecosystem.
- Financing required
- $0.75M
- Total budget
- $1M
- IRR
- 88%
- Payback
- 2.9 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.26
SEC-TA
A GRC cybersecurity platform for automated compliance and end-to-end security management.
- Financing required
- $0.93M
- Total budget
- $1M
- IRR
- 40%
- Payback
- 3.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
IT and communicationsNo. 4.27
ClinicCards 3D AI diagnostic platform
An AI dental radiology platform that analyses 3D scans in seconds with high accuracy, moving from TRL4 to TRL7.
- Financing required
- $5M
- Total budget
- $6M
- IRR
- 35%
- Payback
- 5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
AgrifoodNo. 5.1
Blueberry growing, cooling, sorting and packing complex
A 90 ha blueberry plantation with a Dutch-technology complex for cooling, sorting and storing the fruit.
- Financing required
- $21.9M
- Total budget
- $24.2M
- IRR
- 28%
- Payback
- 7.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Volyn Oblast
AgrifoodNo. 5.2
Green Lactic
A corn processing plant producing lactic acid by industrial biotechnology for Ukraine, the EU and export.
- Financing required
- $241.8M
- Total budget
- $241.8M
- IRR
- 26%
- Payback
- 9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Ivano-Frankivsk Oblast
AgrifoodNo. 5.3
Potato agro-cluster with retort products
A potato processing plant at the Adelaide farm making ready-to-eat and semi-finished products. Vacuum-packed peeled potatoes launched in 2025; planned capacity is 300 t of raw potatoes a day and 20,000 t of products a year.
- Financing required
- $19M
- Total budget
- $38M
- IRR
- 41%
- Payback
- 5.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zhytomyr Oblast
AgrifoodNo. 5.4
Novo Fish
A high-tech fish processing plant focused on salmon processing and packing for the world's main salmon markets.
- Financing required
- $14M
- Total budget
- $16.5M
- IRR
- 19%
- Payback
- 5.2 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Volyn Oblast
AgrifoodNo. 5.5
Novo Cold Terminal
A modern cold logistics terminal for products needing different temperatures.
- Financing required
- $23M
- Total budget
- $28.5M
- IRR
- 14%
- Payback
- 7.2 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Volyn Oblast
AgrifoodNo. 5.6
Tak-Moloko dairy complex
A dairy complex for 1,500 cows in Vinnytsia region.
- Financing required
- $10.1M
- Total budget
- $12.6M
- IRR
- 28%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Vinnytsia Oblast
AgrifoodNo. 5.7
Kraft paper from industrial hemp
A hemp-growing cluster with processing into white kraft paper; pellets made as a by-product supply process heat and are sold.
- Financing required
- $42M
- Total budget
- $44M
- IRR
- 21%
- Payback
- 5.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Chernihiv Oblast
AgrifoodNo. 5.8
Zoryn dairy farm
A dairy farm for 2,000 milking cows in Kyiv region.
- Financing required
- $20M
- Total budget
- $22M
- IRR
- 18.1%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
AgrifoodNo. 5.9
Dairy farm for 2,300 cows
A new barn for 1,200 head and reconstruction of existing buildings for Jersey cattle, with 1,100 Jerseys to be imported from Denmark.
- Financing required
- $11M
- Total budget
- $16M
- IRR
- 22.4%
- Payback
- 3.9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Khmelnytskyi Oblast
AgrifoodNo. 5.10
Industrial hemp processing plant
A plant preparing high-quality hemp seed and decorticating hemp straw into fibre and shives.
- Financing required
- $1M
- Total budget
- $2M
- IRR
- 23.9%
- Payback
- 4.6 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Rivne Oblast
AgrifoodNo. 5.11
Ma'rijany: long hemp fibre for textiles
Ukraine's first modern production of long textile fibre from hemp (the method also works for flax), with short fibre and shives as by-products and support for farmers.
- Financing required
- $68M
- Total budget
- $124M
- IRR
- 24%
- Payback
- 8 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Zhytomyr Oblast
AgrifoodNo. 5.12
Greenhouse complex for vegetables
A 6 ha greenhouse (5.8 ha productive) built on a business running since 2008, growing cucumbers (70%) and tomatoes (30%).
- Financing required
- $20.9M
- Total budget
- $23.9M
- IRR
- 33%
- Payback
- 10 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Rivne Oblast
AgrifoodNo. 5.13
Fruit processing and cold storage expansion in Zhovkva
New production and storage at a Zhovkva fruit plant: 360 t a year of freeze-dried fruit and berries, 1,800–3,600 t of heat-stable fillings, IQF freezing of 100 t a day and more cold storage, aimed at exports.
- Financing required
- $28.5M
- Total budget
- $35.5M
- IRR
- 17%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
AgrifoodNo. 5.14
Breeding unit at a working pig farm
A breeding facility to raise pork output and fill the market gap left by capacity lost to the war.
- Financing required
- $0.75M
- Total budget
- $1.07M
- IRR
- 16.2%
- Payback
- 5.1 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
AgrifoodNo. 5.15
Hempy UA Industrial Park
A Ukrainian industrial park for growing and processing industrial hemp to modern environmental standards.
- Financing required
- $163M
- Total budget
- $163M
- IRR
- 33.9%
- Payback
- 4.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Rivne Oblast
AgrifoodNo. 5.16
Euroland UA: microfertiliser plant
A plant making EDTA-based liquid microfertilisers and specialty plant nutrition: 10,000 t of liquid microfertilisers, 5,000 t of specialty fertilisers and 3,000 t of chelated micronutrients a year.
- Financing required
- $8M
- Total budget
- $13M
- IRR
- 22%
- Payback
- 4 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Ternopil Oblast
AgrifoodNo. 5.17
Cooperative milk processing plant, central Ukraine
A cluster-model dairy plant uniting milk producers and processing to EU standards, handling up to 1,000 t of milk a day and making cheese.
- Financing required
- $100M
- Total budget
- $120M
- IRR
- 22%
- Payback
- 6 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Vinnytsia Oblast, Kyiv Oblast, Cherkasy Oblast
AgrifoodNo. 5.18
1.5 ha greenhouse for rocket and lettuce
A state-of-the-art 1.5 ha greenhouse with automated lettuce lines, built for current market demand.
- Financing required
- $8.5M
- Total budget
- $9.3M
- IRR
- 62%
- Payback
- 3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Khmelnytskyi Oblast
AgrifoodNo. 5.19
Grain elevator, Chernihiv region
A silo complex in Doch-Khlib village, Borzna district, with one-time capacity of 42,000 t and up to 90,000 t a year (32,000 t wheat, 42,000 t corn, 17,000 t oilseeds).
- Financing required
- $8.5M
- Total budget
- $11M
- IRR
- 17%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Chernihiv Oblast
AgrifoodNo. 5.20
Potato processing plant in Cherkasy
A deep potato processing plant with a fully automated line for flakes, flour, fries and crisps, supplying HoReCa and retail, cutting crop losses and replacing imports.
- Financing required
- $60M
- Total budget
- $100M
- IRR
- 15%
- Payback
- 8.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Cherkasy Oblast
AgrifoodNo. 5.21
Fruit processing plant with solar power, Vinnytsia region
A plant for juice concentrates, NFC juices, purées, natural flavours, pectin products and vinegars, with its own solar plant; capacity includes 4,590 t of apple concentrate a year.
- Financing required
- $57.9M
- Total budget
- $64.3M
- IRR
- 21.6%
- Payback
- 5.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Vinnytsia Oblast
AgrifoodNo. 5.22
Vlasne underground cold storage
A 30,000 m² underground cold store with 39,555 automated pallet places and processing, freeze-drying and private-label lines, inside the 600 ha Vlasne Misto cluster 25 km from Kyiv.
- Financing required
- $44.1M
- Total budget
- $63.7M
- IRR
- 53.8%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
AgrifoodNo. 5.23
Deep pea processing plant
Processing 35,000 t of yellow peas a year into 8,800 t of protein concentrate and 22,000 t of starch.
- Financing required
- $20.6M
- Total budget
- $24.2M
- IRR
- 18.3%
- Payback
- 6.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
AgrifoodNo. 5.24
Pustovity grain processing and export hub
A grain storage and milling complex in Kyiv region producing 55,371 t of premium flour, 25,169 t of first-grade flour and 19,128 t of bran a year, all for export.
- Financing required
- $26.4M
- Total budget
- $27.6M
- IRR
- 18.6%
- Payback
- 6.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
AgrifoodNo. 5.25
Eco Agro Hub Podillia Horodok carbon-neutral industrial park
An industrial park with an oil extraction plant, a bioethanol plant and a biomethane plant, creating over 1,000 jobs on a zero-waste, carbon-neutral model.
- Financing required
- $350M
- Total budget
- $500M
- IRR
- 8%
- Payback
- 6.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Khmelnytskyi Oblast
AgrifoodNo. 5.26
Innovative dairy farm in Bessarabia
A dairy farm for 10,000 cows in Odesa region's Bessarabia, using 10,000 ha of land for crops and feed.
- Financing required
- $90M
- Total budget
- $101.7M
- IRR
- 16.2%
- Payback
- 9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Odesa Oblast
AgrifoodNo. 5.27
Beef processing cooperative
A highly automated cattle slaughter and primary processing plant, with plans for deep processing for premium segments such as beef-on-dairy, wagyu and halal.
- Financing required
- $150M
- Total budget
- $160M
- IRR
- 22%
- Payback
- 7 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Odesa Oblast
AgrifoodNo. 5.28
GAF dairy farm
A dairy farm for 1,500 milking cows in Rivne region.
- Financing required
- $10M
- Total budget
- $12M
- IRR
- 28%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Rivne Oblast
AgrifoodNo. 5.29
Simple Task: cold storage and freezing centre
A logistics hub in Bucha community, Kyiv region, with large cold rooms for vegetables, fruit, meat, dairy, fish and chocolate.
- Financing required
- $18.3M
- Total budget
- $24.3M
- IRR
- 70%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
AgrifoodNo. 5.30
Antibiotic-free poultry production
An integrated poultry production and processing platform without antibiotics, meeting EU food safety and environmental rules, based on a patented probiotic technology.
- Financing required
- $56M
- Total budget
- $63M
- IRR
- 5.9%
- Payback
- 8 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kirovohrad Oblast
AgrifoodNo. 5.31
European food fats and ingredients platform, Cherkasy
Redeveloping an existing Cherkasy plant into a production platform for food fats and functional ingredients, using installed equipment and Ukraine's sunflower oil cost advantage.
- Financing required
- $40M
- Total budget
- $40M
- IRR
- 17%
- Payback
- 6 yrs
- Stage
- Asset for sale
- Ownership
- Private
- Region
- Cherkasy Oblast
AgrifoodNo. 5.32
Functional mushroom biotech and biofertiliser platform
An integrated biotech platform growing high-value exotic mushrooms, extracting functional ingredients and turning spent substrate into organic fertiliser.
- Financing required
- $7.9M
- Total budget
- $9.8M
- IRR
- 31%
- Payback
- 3.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
AgrifoodNo. 5.33
Vegetable oil refining and bottling plant
A refining and bottling plant in Pivdennyi port: 350 t a day of refining and 300 t a day of bottling.
- Financing required
- $22M
- Total budget
- $25M
- IRR
- 33%
- Payback
- 6 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
AgrifoodNo. 5.34
Dairy farm with cogeneration
A dairy farm for 2,500 cows with 0.8 MW of biogas cogeneration, producing 28,500 t of raw milk and about 5,500 MWh of electricity a year.
- Financing required
- $20.9M
- Total budget
- $26.1M
- IRR
- 23%
- Payback
- 7.2 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Vinnytsia Oblast
AgrifoodNo. 5.35
Trout Valley
A vertically integrated, high-tech complex for organic trout farming in RAS systems and deep processing.
- Financing required
- $13M
- Total budget
- $62.5M
- IRR
- 30.7%
- Payback
- 2.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Poltava Oblast
AgrifoodNo. 5.36
Beef processing plant, Pustovity
A new industrial beef plant in Pustovity village, Kyiv region, with production aimed at export.
- Financing required
- $6.5M
- Total budget
- $6.9M
- IRR
- 22.8%
- Payback
- 6.4 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
AgrifoodNo. 5.37
POA Ukraina dairy farm
A dairy farm for 1,839 milking cows in Kyiv region.
- Financing required
- $20M
- Total budget
- $22M
- IRR
- 15.1%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
AgrifoodNo. 5.38
USPA Coldchain Port
A complex for storing and preparing fresh fruit for shipment by sea and truck (dry cold-chain port).
- Financing required
- $15M
- Total budget
- $15M
- IRR
- 10.6%
- Payback
- 6 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Vinnytsia Oblast
AgrifoodNo. 5.39
Ricinus EU: castor oil and bio-derivatives hub
A vertically integrated castor business with its own farming, processing and technology, turning 16,000 t of seed into 5,440 t of pharma-grade oil and related products a year.
- Financing required
- $21.5M
- Total budget
- $21.7M
- IRR
- 55%
- Payback
- 3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Vinnytsia Oblast, Odesa Oblast
AgrifoodNo. 5.40
Odesa Portside Plant: large privatisation
Privatisation of one of Ukraine's largest chemical companies, producing and shipping ammonia, urea, liquid nitrogen, CO₂ and liquid oxygen.
- Financing required
- on request
- Total budget
- on request
- Stage
- Asset for sale
- Ownership
- Public
- Region
- Odesa Oblast
AgrifoodNo. 5.41
Fruit and vegetable storage, sorting and packing complex
A 5,000 t complex next to the Vidrodzhennia farm's orchard for storage, sorting, packing and delivery to wholesale markets and Ukrainian retail chains.
- Financing required
- $3.5M
- Total budget
- $3.5M
- IRR
- 24.4%
- Payback
- 2.8 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
AgrifoodNo. 5.42
Euroland UA: pea processing plant
A pea processing plant in western Ukraine making high-value food and feed ingredients for EU and Ukrainian markets.
- Financing required
- $35M
- Total budget
- $45M
- IRR
- 24.1%
- Payback
- 4 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Ternopil Oblast
AgrifoodNo. 5.43
Blueberry post-harvest processing plant
A facility for sorting, grading, packing, fast cooling and cold storage of own and third-party blueberries, producing export-grade fruit for Ukraine and the EU.
- Financing required
- $7.2M
- Total budget
- $9M
- IRR
- 15%
- Payback
- 5 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Lviv Oblast
AgrifoodNo. 5.44
Regional grain hub, Vinnytsia region
Buying and upgrading two working elevators into a hub with 96,500 t of storage and direct rail access, offering full grain handling for local producers and traders.
- Financing required
- $8M
- Total budget
- $8M
- IRR
- 17%
- Payback
- 5 yrs
- Stage
- Asset for sale
- Ownership
- Private
- Region
- Vinnytsia Oblast
AgrifoodNo. 5.45
Sunflower seed extraction line
A new extraction line processing 85,000 t of sunflower seed a year into 37,000 t of oil and 32,000 t of meal.
- Financing required
- $3.1M
- Total budget
- $3.2M
- IRR
- 43%
- Payback
- 3.3 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Vinnytsia Oblast
Green steelNo. 6.1
Flagship project
DR-grade pellet production
Upgrading a plant in Kryvyi Rih to make direct-reduction pellets for green steel, with a new flotation complex and a modernised pelletising machine.
- Financing required
- $340M
- Total budget
- $527M
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Green steelNo. 6.2
Greenfield HBI plant, 2–2.5 Mtpa
A direct reduction module supplying 2–2.5 million tonnes of HBI a year to Ukrainian and European green steelmakers, fed by Ukrainian DR-grade pellets.
- Financing required
- $1B
- Total budget
- $1B
- IRR
- 20%
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Poltava Oblast
Green steelNo. 6.3
Flagship project
Green EAF flat steel production, Dnipro
An electric arc furnace and hot rolling line at an existing Dnipro mill, adding 1 million tonnes a year of low-carbon hot-rolled coil made from hydrogen-based DRI/HBI and scrap.
- Financing required
- $900M
- Total budget
- $1B
- Payback
- 8 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Green steelNo. 6.4
Black Iron: Shymanivske iron ore deposit
A modern mine and processing plant at the Shymanivske deposit producing ultra-high-grade 68% Fe concentrate, with an offtake and funding agreement with Anglo American-Teck.
- Financing required
- $450M
- Total budget
- $550M
- IRR
- 40.5%
- Payback
- 2.9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Green steelNo. 6.5
New continuous casting machine and EAF at Kamet Steel
Two-stage, low-carbon slab production: a new 2.5 Mt-a-year caster, then an electric arc furnace making up to 1.7 Mt of crude steel a year.
- Financing required
- $715M
- Total budget
- $1.1B
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Green steelNo. 6.6
Green EAF steelmaking in Kryvyi Rih
A new scrap-based electric arc furnace with 1 Mt a year capacity at a Kryvyi Rih steel shop.
- Financing required
- $200M
- Total budget
- $200M
- IRR
- 40.5%
- Payback
- 6 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
HealthcareNo. 7.1
Modern liposomal medicines
Developing and launching a range of liposomal drugs.
- Financing required
- $3.1M
- Total budget
- $3.1M
- IRR
- 23%
- Payback
- 7 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv
HealthcareNo. 7.2
Solid dosage forms innovation hub
A plant for tablets and other solid forms not yet registered in Ukraine or nearing patent expiry, but in high demand in Europe.
- Financing required
- $5M
- Total budget
- $7M
- IRR
- 18%
- Payback
- 7 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
HealthcareNo. 7.3
mRNA vaccine production facility
A full-cycle mRNA vaccine plant with a research lab and capacity of 100 million doses a year, for health security through local production.
- Financing required
- $268M
- Total budget
- $273.4M
- IRR
- 40%
- Payback
- 15 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Kyiv
HealthcareNo. 7.4
Active pharmaceutical ingredients plant
A chemical plant producing APIs to diversify supply to the EU through near-shoring.
- Financing required
- $107.7M
- Total budget
- $109.4M
- IRR
- 20%
- Payback
- 11 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Kyiv
HealthcareNo. 7.5
PharmaHub Central: core of the GVSC
A pharmaceutical warehouse complex in Kyiv region, the central element of Ukraine's future Global Vital Supply Chain for storing, consolidating and distributing vital medicines.
- Financing required
- $13.1M
- Total budget
- $19.4M
- IRR
- 14%
- Payback
- 8 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
HealthcareNo. 7.6
ClinCaseQuest simulation-based medical training
An AI-powered simulation training platform for healthcare professionals.
- Financing required
- $1M
- Total budget
- $1M
- IRR
- 40%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kharkiv Oblast
HealthcareNo. 7.7
VRNOW medical VR simulator for rehabilitation
A Ukrainian VR simulator by ADVIN GLOBAL for rehabilitating military and civilian patients with limb loss or musculoskeletal disorders.
- Financing required
- $1.2M
- Total budget
- $3.2M
- IRR
- 56%
- Payback
- 1.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kyiv
HealthcareNo. 7.8
Garvis-2 clinic in Dnipro
A new clinic built to JCI standards as the hub of a healthcare ecosystem, with modern technology.
- Financing required
- $11.2M
- Total budget
- $14.9M
- IRR
- 14.3%
- Payback
- 3.6 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
HealthcareNo. 7.9
Clinical research centre
A private centre running drug and medical device trials to EU and US standards, taking advantage of lower costs and skilled medical staff in Eastern Europe.
- Financing required
- $2.2M
- Total budget
- $2.9M
- IRR
- 38%
- Payback
- 7 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Kyiv
HealthcareNo. 7.10
Health Market multifunctional medical centre
A medical centre with a full range of services and a health complex for prevention, diagnosis, treatment and rehabilitation.
- Financing required
- $8.3M
- Total budget
- $8.3M
- IRR
- 57%
- Payback
- 2 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
HealthcareNo. 7.11
Prana Medica medical centre
A modern space combining quality medical, rehabilitation and sports services in one platform.
- Financing required
- $10M
- Total budget
- $22M
- IRR
- 18%
- Payback
- 6 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Lviv Oblast
HealthcareNo. 7.12
Large joint endoprostheses from medical titanium
Titan-Med plans to produce titanium joint implants in Ukraine using 3D printing with osteo-bio-integration, closing a gap in patient access once equipment is funded.
- Financing required
- $4.3M
- Total budget
- $5M
- IRR
- 40.7%
- Payback
- 5.3 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Kyiv Oblast
HealthcareNo. 7.13
PPP: new multidisciplinary hospital in Zhytomyr
Zhytomyr City Council seeks a partner to build one consolidated hospital with centralised departments for diagnosis and treatment of a wide range of conditions.
- Financing required
- $156.4M
- Total budget
- $156.4M
- Stage
- Feasibility study
- Ownership
- PPP
- Region
- Zhytomyr Oblast
HealthcareNo. 7.14
PPP: new surgical hospital in Lviv
Lviv City Council plans a specialised multidisciplinary facility to strengthen the UNBROKEN rehabilitation ecosystem as demand for war-injury surgery grows.
- Financing required
- $134.8M
- Total budget
- $134.8M
- Stage
- Feasibility study
- Ownership
- PPP
- Region
- Lviv Oblast
HealthcareNo. 7.15
Cyclotron centre at SE USIE Izotop
A building for a cyclotron centre, with equipment and new quality control, radiochemistry and target restoration labs.
- Financing required
- $56M
- Total budget
- $56M
- IRR
- 7.3%
- Payback
- 9 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Kyiv
HealthcareNo. 7.16
OnlineCRF integrated research platform
A digital platform for managing and overseeing clinical studies; the funding will grow sales, operations and international presence.
- Financing required
- $4M
- Total budget
- $7M
- IRR
- 28%
- Payback
- 5.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
Critical raw materialsNo. 8.1
Flagship project
Balakhivka graphite: concentrate production (phase I)
Developing the Balakhivka deposit with 44 Mt of NI 43-101 reserves (185 Mt explored): a mine with a 29-year life and a 50,000 t-a-year concentrate plant.
- Financing required
- $140M
- Total budget
- $140M
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kirovohrad Oblast
Critical raw materialsNo. 8.2
Flagship project
Balakhivka graphite: spherical graphite (phase II)
A spherical graphite plant completing the value chain, making 19,000 t a year of purified spherical graphite for Li-ion battery anodes.
- Financing required
- $269M
- Total budget
- $269M
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kirovohrad Oblast
Critical raw materialsNo. 8.3
Perzhanske beryllium deposit
A well-explored complex beryllium deposit in northern Ukraine with 2.4 Mt of ore at 0.59% BeO within the licence area.
- Financing required
- $198M
- Total budget
- $198M
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zhytomyr Oblast
Critical raw materialsNo. 8.4
Yastrebetske zircon, rare earths and fluorite deposit
A complex deposit in Zhytomyr region (zircon, parisite rare earths, fluorite, feldspar) with paved road to Olevsk and a railway nearby.
- Financing required
- $198M
- Total budget
- $198M
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zhytomyr Oblast
Critical raw materialsNo. 8.5
Zarichna graphite area, Zavallivske deposit
The Zarichna area in northern Odesa region holds 18.95 Mt of explored reserves under licence plus 14.6 Mt of C2 resources, at an average 5.5% TGC.
- Financing required
- $100M
- Total budget
- $100M
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Odesa Oblast
Critical raw materialsNo. 8.6
Flagship project
Ukrainian critical raw materials cluster, phase 1
Velta Holding's titanium cluster, first phase: more output of titanium, zircon derivatives and hafnium to restore Ukraine's place in critical raw material markets.
- Financing required
- $134M
- Total budget
- $169.5M
- IRR
- 30%
- Payback
- 4.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kirovohrad Oblast
Critical raw materialsNo. 8.7
Flagship project
Titanium powders, alloys and products, phase 2
The second phase of Velta's titanium cluster: advanced production of titanium powders, alloys and finished products.
- Financing required
- $45.6M
- Total budget
- $57M
- IRR
- 23%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kirovohrad Oblast
Critical raw materialsNo. 8.8
Polokhivske lithium deposit
UkrLithiumMining holds the production licence for and is developing the Polokhivske lithium deposit.
- Financing required
- $350M
- Total budget
- $370M
- IRR
- 50%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kirovohrad Oblast
Critical raw materialsNo. 8.9
Flagship project
More uranium mining at the Novokostiantynivske deposit
The state-owned Eastern Mining and Processing Plant, one of the world's largest uranium producers, plans a mine for 1.5 Mt of ore a year.
- Financing required
- $406.2M
- Total budget
- $526.2M
- IRR
- 18%
- Payback
- 9 yrs
- Stage
- Under implementation
- Ownership
- Public
- Region
- Kirovohrad Oblast
Critical raw materialsNo. 8.10
Large privatisation: Demurinsky mining and processing plant
A leading mining company that has worked the Volchansk titanium-zircon placer in Dnipropetrovsk region since 2006.
- Financing required
- on request
- Total budget
- on request
- Stage
- Asset for sale
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Critical raw materialsNo. 8.11
Stremyhorodske ilmenite deposit
A chance to secure a 50-year licence for a state-owned 225 ha ilmenite deposit in Zhytomyr region, discovered in 1954, with scandium and vanadium as associated ores.
- Financing required
- $400M
- Total budget
- $1B
- Stage
- Concept
- Ownership
- Public
- Region
- Zhytomyr Oblast
Critical raw materialsNo. 8.12
Yuriivsko-Koziivske ilmenite and zircon deposit
Titanium-zircon sands of the Novopetrivka suite, with the productive layer ranging from 0.5 to 16.5 m thick.
- Financing required
- $200M
- Total budget
- $200M
- Stage
- Concept
- Ownership
- Public
- Region
- Zhytomyr Oblast
Critical raw materialsNo. 8.13
Tarasivske ilmenite and zircon deposit
An ilmenite-zircon deposit in a three-layer geological setting, with Cretaceous sediments in paleovalleys under Cenozoic cover.
- Financing required
- $200M
- Total budget
- $200M
- Stage
- Concept
- Ownership
- Public
- Region
- Kyiv Oblast
Critical raw materialsNo. 8.14
Lypovenkivske polymetallic deposit
Two blocks, Zakhidna and Shkilna, near Lypovenke village; the Zakhidna block contains chromite ores.
- Financing required
- $150M
- Total budget
- $150M
- Stage
- Concept
- Ownership
- Public
- Region
- Kirovohrad Oblast
Critical raw materialsNo. 8.15
Burtynske graphite deposit
The Maidanska area of the Burtynske deposit sits in the Volyn block of the Ukrainian Shield, hosted by deeply metamorphosed Teteriv series rocks.
- Financing required
- $300M
- Total budget
- $300M
- Stage
- Concept
- Ownership
- Public
- Region
- Khmelnytskyi Oblast
Industrial manufacturingNo. 9.1
Seamless tube production upgrade
A new press line and bright annealing furnace, plus upgrades that create a continuous flow line.
- Financing required
- $16M
- Total budget
- $20M
- IRR
- 20.2%
- Payback
- 6 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.2
OCTG tubes and pipes
Entering the premium OCTG segment with seamless stainless pipes to 25 CRA standards, aimed at carbon capture and storage projects in the US and Europe.
- Financing required
- $10M
- Total budget
- $11M
- IRR
- 32%
- Payback
- 2.6 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.3
Agricultural machinery plant, Vinnytsia region
A greenfield plant in Vinindustry Industrial Park making automated tillage and seeding equipment, with 5.7 ha of production area, laser cutting and robotic welding.
- Financing required
- $120M
- Total budget
- $140M
- IRR
- 12.8%
- Payback
- 9.2 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Vinnytsia Oblast
Industrial manufacturingNo. 9.4
Heat treatment line for railway wheels
A furnace and three quenching machines in an operating workshop, enabling up to 120,000 t of wheels a year, with room for a fourth machine.
- Financing required
- $17.5M
- Total budget
- $25M
- Payback
- 4 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.5
Granulated mineral fertiliser plant
The Phosfogram project: a plant for granulated single superphosphate with 100 t a day capacity.
- Financing required
- $5M
- Total budget
- $7M
- IRR
- 27%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kirovohrad Oblast
Industrial manufacturingNo. 9.6
Railway passenger seating production expansion
Scaling production of rail components, including new first and second class seats and airtight inter-car gangways.
- Financing required
- $1.25M
- Total budget
- $2.43M
- IRR
- 24.5%
- Payback
- 4.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Lviv Oblast
Industrial manufacturingNo. 9.7
Shapid AGV robotic platform
Goods-to-person warehouse robots with in-house fleet software; the project industrialises production and prepares certification for the EU and US.
- Financing required
- $1M
- Total budget
- $2M
- IRR
- 17%
- Payback
- 2 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
Industrial manufacturingNo. 9.8
Formatsia.Lviv Industrial Park
A modern industrial park built to host manufacturers and innovative companies.
- Financing required
- $51.3M
- Total budget
- $88M
- IRR
- 11%
- Payback
- 9 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Lviv Oblast
Industrial manufacturingNo. 9.9
New tram production plant
A 30,000 m² plant in Dnipro (or western Ukraine) for 100 trams and LRT vehicles a year, with up to 60% European content.
- Financing required
- $30M
- Total budget
- $33M
- IRR
- 42%
- Payback
- 4 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.10
Passenger car production at Eurocar
Full-cycle car manufacturing with global automakers for export and the Ukrainian market.
- Financing required
- $465M
- Total budget
- $580M
- IRR
- 20.2%
- Payback
- 6.3 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Zakarpattia Oblast
Industrial manufacturingNo. 9.11
Truck production at Eurocar
Trucks and special vehicles built with global automakers for export and the domestic market.
- Financing required
- $135M
- Total budget
- $169M
- IRR
- 32.2%
- Payback
- 4.1 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Zakarpattia Oblast
Industrial manufacturingNo. 9.12
Certified EPAL pallet production
Scaling a veteran-owned pallet maker in Poltava with a new sawing, drying and automated assembly line for 180,000 pallets a year.
- Financing required
- $1M
- Total budget
- $1.1M
- IRR
- 35%
- Payback
- 2.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Poltava Oblast
Industrial manufacturingNo. 9.13
City bus and electric bus production
Expanding manufacturing capacity for urban buses and electric buses.
- Financing required
- $19.4M
- Total budget
- $19.4M
- IRR
- 19.5%
- Payback
- 4.9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
Industrial manufacturingNo. 9.14
Electric motor production expansion
Modernising production to make more electric motors.
- Financing required
- $10M
- Total budget
- $13M
- IRR
- 24.4%
- Payback
- 4.6 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Lviv Oblast
Industrial manufacturingNo. 9.15
Components for surveillance and security systems
Technology for epitaxial structures and industrial production of epitaxial crystals used in generation elements.
- Financing required
- $54M
- Total budget
- $58M
- IRR
- 6.5%
- Payback
- 6.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
Industrial manufacturingNo. 9.16
Modern tractor and farm machinery production
Supplying Ukrainian farms with domestic machinery through cooperation between the Makarov Southern Machine-Building Plant and global tractor makers.
- Financing required
- $9.7M
- Total budget
- $10M
- IRR
- 14.3%
- Payback
- 4.7 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.17
Agricultural machinery company expansion
Buying and commissioning extra metalworking machines to raise output and efficiency.
- Financing required
- $1.4M
- Total budget
- $1.6M
- IRR
- 15%
- Payback
- 6 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Odesa Oblast
Industrial manufacturingNo. 9.18
Scaling grain separator production
CAD aerodynamic separators sort seed by specific gravity, selecting material that can lift yields by up to 40%.
- Financing required
- $1M
- Total budget
- $1.2M
- IRR
- 23%
- Payback
- 6.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Cherkasy Oblast
Industrial manufacturingNo. 9.19
Automatic welding machine
A machine that welds metal structures and parts automatically.
- Financing required
- $2M
- Total budget
- $2.5M
- IRR
- 21%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Public
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.20
Smart industrial gas meters
Mass production of high-precision ultrasonic smart gas meters for industry.
- Financing required
- $3M
- Total budget
- $3.5M
- IRR
- 2.4%
- Payback
- 4 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kharkiv Oblast
Industrial manufacturingNo. 9.21
Sustainable furniture factory in Lviv
A new furniture factory designed to run entirely on sustainability principles.
- Financing required
- $6M
- Total budget
- $7M
- IRR
- 32%
- Payback
- 7 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
Industrial manufacturingNo. 9.22
Beech and oak panels and solid wood furniture
Skif, a furniture maker supplying Jysk, XXXLutz, Agata and Evolution Trade, is building a 2,750 m² workshop with two new lines for dining furniture.
- Financing required
- $1M
- Total budget
- $1.3M
- IRR
- 30%
- Payback
- 5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Chernivtsi Oblast
Industrial manufacturingNo. 9.23
Eco-friendly wooden play equipment for children
Goodevas, a known Ukrainian maker of safe wooden play structures, is adding 5,000 m² of production and storage in the Bucha industrial park.
- Financing required
- $2M
- Total budget
- $3M
- IRR
- 30%
- Payback
- 4 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
Industrial manufacturingNo. 9.24
AdBlue production
Making AdBlue to cut NOx emissions from road transport.
- Financing required
- $1M
- Total budget
- $1.1M
- IRR
- 73%
- Payback
- 3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.25
Polymer sheet production
A new company producing plastic polymer sheets.
- Financing required
- $4.3M
- Total budget
- $4.3M
- IRR
- 26%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.26
Non-woven materials production
Reviving an experienced producer with modern Italian, energy-efficient equipment and an export focus on European clients.
- Financing required
- $9.8M
- Total budget
- $9.8M
- IRR
- 14%
- Payback
- 8 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Mykolaiv Oblast
Industrial manufacturingNo. 9.27
Textile waste recycling infrastructure
Reinventex is Ukraine's first pilot for collecting, sorting and recycling post-industrial and post-consumer textiles, in line with the EU waste strategy.
- Financing required
- $3.4M
- Total budget
- $4M
- IRR
- 21%
- Payback
- 3 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
Industrial manufacturingNo. 9.28
Textile-Contact automated sewing lines
Adding automated lines at an existing sewing factory for men's and women's clothing.
- Financing required
- $11.5M
- Total budget
- $15.8M
- IRR
- 29%
- Payback
- 4 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Chernihiv Oblast
Industrial manufacturingNo. 9.29
Integrated tissue and hygiene products complex
VGP is developing an integrated complex for tissue base paper reels and consumer hygiene products.
- Financing required
- $35M
- Total budget
- $45.7M
- IRR
- 16%
- Payback
- 8 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Volyn Oblast
Industrial manufacturingNo. 9.30
Velta kaolin project
Using over 500 Mt of reserves and existing infrastructure to win back Ukraine's share of the world kaolin market and fill EU supply gaps.
- Financing required
- $18M
- Total budget
- $22.5M
- IRR
- 27%
- Payback
- 4.5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kirovohrad Oblast
Industrial manufacturingNo. 9.31
Metal packaging production
A modern complex for manufacturing metal packaging.
- Financing required
- $15.4M
- Total budget
- $19.3M
- IRR
- 27.1%
- Payback
- 6 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.32
Laminate tubes for food, cosmetics and pharma
In-house laminate tube production to lower the company's costs and sell tubes to others.
- Financing required
- $10.2M
- Total budget
- $10.2M
- IRR
- 20%
- Payback
- 5.1 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Industrial manufacturingNo. 9.33
Cosmetics research and certification laboratory
A lab for testing and certifying cosmetics, alongside AI software for analysing and monitoring products.
- Financing required
- $3.7M
- Total budget
- $3.7M
- IRR
- 20.5%
- Payback
- 4 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
Industrial manufacturingNo. 9.34
Sirocco Energy innovative wind turbines
From 2026 to 2028 Sirocco Energy will produce 30 kW to 1 MW turbines for decentralised business power, using contract component makers and its own assembly lines.
- Financing required
- $22M
- Total budget
- $22M
- IRR
- 58%
- Payback
- 7 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
Industrial manufacturingNo. 9.35
Large privatisation: Motordetal-Konotop
A Ukrainian maker of cylinder liners for internal combustion engines, known for volume output and quality.
- Financing required
- on request
- Total budget
- on request
- Stage
- Asset for sale
- Ownership
- Private
- Region
- Sumy Oblast
Industrial manufacturingNo. 9.36
Large privatisation: Sumykhimprom
Ukraine's only phosphate fertiliser producer and a major maker of titanium dioxide pigment.
- Financing required
- $28.8M
- Total budget
- $28.8M
- Stage
- Asset for sale
- Ownership
- Public
- Region
- Sumy Oblast
Industrial manufacturingNo. 9.37
Granulated limestone plant
Granulated limestone in 2–6 and 6–10 mm fractions from own raw material, 10 t an hour or about 19,000 t a year for farmers.
- Financing required
- $0.95M
- Total budget
- $1M
- IRR
- 72.5%
- Payback
- 2.3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Ternopil Oblast
Industrial manufacturingNo. 9.38
Glassware manufacturing plant
A fully automated household glassware plant with batch preparation, a melting furnace and press-and-blow forming, making 17 t a day.
- Financing required
- $11.3M
- Total budget
- $13.4M
- IRR
- 48.7%
- Payback
- 3.3 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Lviv Oblast
Industrial manufacturingNo. 9.39
Grafix powder coating equipment for export
Grafix will expand production and launch energy-efficient coating systems, aiming to triple exports to the EU, US, Asia and Africa.
- Financing required
- $1M
- Total budget
- $1.1M
- IRR
- 25%
- Payback
- 3 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
Industrial manufacturingNo. 9.40
Battalion of Makers: national industrial hubs
Grafix plans 10 metalworking and powder coating hubs across Ukraine in 2025–2028, employing veterans in the regions.
- Financing required
- $1.2M
- Total budget
- $1.5M
- IRR
- 20%
- Payback
- 3.5 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Vinnytsia Oblast, Dnipropetrovsk Oblast, Ivano-Frankivsk Oblast, Kyiv Oblast, Lviv Oblast, Odesa Oblast, Rivne Oblast, Ternopil Oblast, Kharkiv Oblast
Construction materialsNo. 10.1
Waste heat recovery system
Turning residual heat from clinker burning into electricity to cut operating costs.
- Financing required
- $21.5M
- Total budget
- $30.7M
- IRR
- 19%
- Payback
- 8.3 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Construction materialsNo. 10.2
Clinker kiln upgrade with alternative fuel
Upgrading a kiln to run on up to 45% RDF and raising capacity by 15% to 4,000 t a day.
- Financing required
- $19M
- Total budget
- $23.7M
- IRR
- 27%
- Payback
- 6.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Construction materialsNo. 10.3
MSW processing plant producing RDF
A municipal waste plant with Eggersmann MBT technology yielding up to 23% RDF for cement kilns.
- Financing required
- $12.2M
- Total budget
- $17.4M
- IRR
- 15%
- Payback
- 5.2 yrs
- Stage
- Feasibility study
- Ownership
- PPP
- Region
- Dnipropetrovsk Oblast
Construction materialsNo. 10.4
BetonEnergo reinforced concrete plant
A 150,000 m³-a-year plant for housing, infrastructure and energy reconstruction, using robotics, AI quality control and greener processes.
- Financing required
- $13.5M
- Total budget
- $16.9M
- IRR
- 38%
- Payback
- 5.6 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
Construction materialsNo. 10.5
Precast concrete plant
A first precast plant in Kyiv (or Zhytomyr) region to build faster and cheaper across regions, with a second plant planned in Lviv region.
- Financing required
- $43M
- Total budget
- $43M
- IRR
- 25%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
Construction materialsNo. 10.6
Flagship project
Float and coated glass plant
Production of float and coated glass for growing demand across Ukrainian industries.
- Financing required
- $210.3M
- Total budget
- $306.2M
- IRR
- 29.6%
- Payback
- 7.9 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
Construction materialsNo. 10.7
Float glass plant as cluster anchor
A float glass plant aiming for a large domestic market share and anchoring a glass industry cluster in a designated zone.
- Financing required
- $100M
- Total budget
- $150M
- IRR
- 46%
- Payback
- 6.7 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
Construction materialsNo. 10.8
Sheet glass complex with silica sand mining
A float glass complex with its own sand quarry and enrichment, making architectural, automotive and energy-efficient glass to replace imports.
- Financing required
- $195M
- Total budget
- $278.5M
- IRR
- 31.4%
- Payback
- 5.1 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Zakarpattia Oblast
Construction materialsNo. 10.9
Heavy steel structures plant
A plant for heavy steel structures for bridges, industrial buildings and wind turbine towers.
- Financing required
- $72M
- Total budget
- $80M
- IRR
- 7%
- Payback
- 8 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Vinnytsia Oblast
Construction materialsNo. 10.10
Hot-dip galvanising line for steel wire
A new galvanising line for better efficiency, lower energy use and higher-margin products.
- Financing required
- $3.5M
- Total budget
- $4.4M
- IRR
- 27%
- Payback
- 5.7 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Dnipropetrovsk Oblast
Construction materialsNo. 10.11
Basalt fibre insulation plant
A full-cycle plant for basalt fibre thermal insulation that meets European safety and efficiency standards.
- Financing required
- $92.3M
- Total budget
- $92.3M
- IRR
- 21.8%
- Payback
- 5 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Rivne Oblast
Construction materialsNo. 10.12
Integrated fibreglass plant
A fibreglass plant for composites that also recycles glass waste on circular economy principles.
- Financing required
- $8M
- Total budget
- $10M
- IRR
- 40%
- Payback
- 3 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Kyiv Oblast
Construction materialsNo. 10.13
Modular house plant using Fachwerk and CLT
A German assembly line for energy-efficient Fachwerk and CLT panel houses, mainly for sale abroad.
- Financing required
- $7.2M
- Total budget
- $7.2M
- IRR
- 13.8%
- Payback
- 2 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Odesa Oblast
Construction materialsNo. 10.14
Continuous basalt fibre plant
A full-cycle plant for continuous basalt fibre and products such as rebar, mesh, pipes and technical textiles.
- Financing required
- $73M
- Total budget
- $73M
- IRR
- 23.4%
- Payback
- 4.5 yrs
- Stage
- Ready for implementation
- Ownership
- Private
- Region
- Rivne Oblast
Construction materialsNo. 10.15
Thermoformed siding production
An energy-efficient plant for moulded siding, reaching full equipment load within four years.
- Financing required
- $1.9M
- Total budget
- $1.9M
- IRR
- 49.6%
- Payback
- 3 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Vinnytsia Oblast
Construction materialsNo. 10.16
Berezan architectural glass
Phase 2 of the Berezan float glass project: 5 million m² a year of coated architectural glass in the City of Glass industrial park.
- Financing required
- $20M
- Total budget
- $30M
- IRR
- 30%
- Payback
- 4 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
Construction materialsNo. 10.17
Aerated concrete plant, TR-Forge Industrial Park
An autoclaved aerated concrete plant as the anchor resident of TR-Forge park.
- Financing required
- $19.6M
- Total budget
- $25M
- IRR
- 25%
- Payback
- 5.3 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Kyiv Oblast
Defence techNo. 11.1
Himera
A Ukrainian developer of field-proven communication systems for the Defence Forces.
- Financing required
- $10M
- Total budget
- $36.5M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.2
UAV components manufacturing complex
Automated, NDAA-compliant production of UAV component kits with in-house SMT lines.
- Financing required
- $27.3M
- Total budget
- $30.2M
- Stage
- Technology development (TRL 7)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.3
UASat Ukrainian LEO satellite constellation
A sovereign low-orbit satcom constellation giving secure, independent connectivity to defence, government and critical infrastructure in Ukraine and Europe.
- Financing required
- $905M
- Total budget
- $940M
- IRR
- 28%
- Payback
- 4 yrs
- Stage
- Concept
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.4
Swarmer
AI software that lets one operator run several drones as a coordinated autonomous group.
- Financing required
- $15M
- Total budget
- $120M
- IRR
- 35–45%
- Payback
- 4 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.5
Yautja reconnaissance and strike complex
A ground control station with up to 12 drones for reconnaissance and strike missions.
- Financing required
- $2.5M
- Total budget
- $11.5M
- IRR
- 68%
- Payback
- 0.7 yrs
- Stage
- Technology development (TRL 7)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.6
Dozor AI
AI-based counter-drone software and hardware for autonomous interception.
- Financing required
- $1M
- Total budget
- $10M
- Stage
- Technology development (TRL 5)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.7
PanoptesAI
An optical drone detection network of ground, mobile and aerial stations, feeding air defence and command centres in real time.
- Financing required
- $1.3M
- Total budget
- $6.4M
- IRR
- 40%
- Payback
- 2 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.8
Ghost Runner
A ground robotic system of two or more four-wheel-drive platforms for tactical tasks in combat zones.
- Financing required
- $3M
- Total budget
- $5.1M
- IRR
- 30%
- Payback
- 2 yrs
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.9
SleamAk
A wheeled UGV that takes over logistics, mining and reconnaissance tasks from soldiers.
- Financing required
- $1M
- Total budget
- $3M
- Stage
- Under implementation
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.10
Thermal camera factory
A vertically integrated plant in western Ukraine for uncooled thermal cameras, from sensors to final assembly, set to be Europe's largest sensor facility.
- Financing required
- $72.5M
- Total budget
- $80.5M
- IRR
- 47%
- Payback
- 3.5 yrs
- Stage
- Technology development (TRL 4)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.11
Toloka
Autonomous underwater vehicles for naval missions with AI target recognition, sonar and secure communications.
- Financing required
- $12M
- Total budget
- $20M
- IRR
- 38%
- Payback
- 2.5 yrs
- Stage
- Technology development (TRL 8)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.12
Ratel Robotics
A young defence robotics company building modular autonomous UGVs, field-tested in Ukraine, to reduce risk to soldiers.
- Financing required
- $5.8M
- Total budget
- $58M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.13
Roboneers
A pioneer of Ukrainian combat ground robots and the first with products officially approved for frontline use.
- Financing required
- $8M
- Total budget
- $50M
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.14
Ravlyk universal mobile platform
UMP-2 Ravlyk is a remote-controlled 6×6 electric platform for logistics and evacuation in hard terrain.
- Financing required
- $23M
- Total budget
- $25M
- IRR
- 14%
- Payback
- 6.8 yrs
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.15
SMT manufacturing for critical defence components
A two-site SMT hub in Ukraine and the EU to localise electronics supply for unmanned systems.
- Financing required
- $12M
- Total budget
- $15M
- IRR
- 116%
- Payback
- 1.1 yrs
- Stage
- Feasibility study
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.16
Thermal vision systems for UAV and ISR
Scaling output of combat-proven dual-use thermal modules, improving supply chains and entering EU markets.
- Financing required
- $10M
- Total budget
- $15M
- IRR
- 55%
- Payback
- 2.5 yrs
- Stage
- Technology development (TRL 8)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.17
Buntar-3 production scale-up
Expanding production of the Buntar-3 VTOL ISR system for the Ukrainian Armed Forces and foreign customers.
- Financing required
- $8M
- Total budget
- $10M
- IRR
- 68%
- Payback
- 2.5 yrs
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.18
Multi-calibre heavy machine gun platform
Development and local production of a versatile heavy machine gun platform based on frontline experience.
- Financing required
- $4.5M
- Total budget
- $5.5M
- IRR
- 42%
- Payback
- 2.5 yrs
- Stage
- Technology development (TRL 4)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.19
Fragmentation-protected mobile cybersecurity centre
A mobile cyber response centre on a specialised vehicle with anti-fragmentation armour for high-risk areas.
- Financing required
- $3.5M
- Total budget
- $4M
- IRR
- 28%
- Payback
- 4 yrs
- Stage
- Technology development (TRL 4)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.20
Falcons RF-enabled recon-strike system
A system that detects radio-emitting threats and supports precise targeting in contested environments.
- Financing required
- $2M
- Total budget
- $3M
- IRR
- 45%
- Payback
- 3 yrs
- Stage
- Technology development (TRL 7)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.21
Iron Army
Scaling production of UGVs and AI modules for remote combat.
- Financing required
- $6M
- Total budget
- $10M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.22
LARS
Moving dual-use robotic platforms for defence and emergency services into serial production, with R&D and maintenance infrastructure.
- Financing required
- $4M
- Total budget
- $5M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.23
Konyk One
A highly mobile UGV for logistics and casualty evacuation under fire.
- Financing required
- $1.5M
- Total budget
- $2M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.24
UGV Mars
Modular ground robots and specialised robotic components.
- Financing required
- $1.2M
- Total budget
- $1.5M
- Stage
- Technology development (TRL 4)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.25
ABFF high-altitude platform station
Scaling a high-altitude platform for long-range strike and reconnaissance.
- Financing required
- $2M
- Total budget
- $15M
- Stage
- Technology development (TRL 7)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.26
Shadox
A compact close-range unmanned system for infantry reconnaissance and engagement.
- Financing required
- $1.5M
- Total budget
- $15M
- Stage
- Technology development (TRL 7)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.27
Krylatyy
Scaling strike UAV production with fully autonomous AI vision.
- Financing required
- $4M
- Total budget
- $8M
- IRR
- 35%
- Payback
- 2–2.5 yrs
- Stage
- Technology development (TRL 8)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.28
Besomar 3210
Serial production of a versatile UAV for reconnaissance, strike and logistics.
- Financing required
- $1.2M
- Total budget
- $5.6M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.29
Flame
UAVs with a 100 km range and 5 kg payload.
- Financing required
- $1.5M
- Total budget
- $1.5M
- Stage
- Technology development (TRL 6)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.30
Kazhan Firefighter
An unmanned aerial system for spotting fires early and putting them out quickly.
- Financing required
- $0.8M
- Total budget
- $1.2M
- IRR
- 49%
- Payback
- 5.3 yrs
- Stage
- Technology development (TRL 6)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.31
Aiura
Upgrading dual-use onboard AI autonomy for GNSS-denied conditions.
- Financing required
- $1.2M
- Total budget
- $11.7M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.32
LifeSaverSim
A mobile, game-based medical training platform for first responders and military personnel.
- Financing required
- $2.5M
- Total budget
- $7M
- IRR
- 20%
- Payback
- 5 yrs
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.33
eVision
AI navigation that works without GPS, using RGB and thermal sensors.
- Financing required
- $1M
- Total budget
- $3M
- Stage
- Technology development (TRL 6)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.34
SOTA
R&D on a towed autonomous module for covert transport and launch of drone swarms.
- Financing required
- $1.9M
- Total budget
- $2M
- Stage
- Technology development (TRL 4)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.35
High-performance UAV battery systems
Scaling production of high-performance battery systems for UAV platforms.
- Financing required
- $2M
- Total budget
- $15M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.36
Dual-use innovation test centre
An underground test and certification complex for communications, EMC/EMI and electronic resilience R&D.
- Financing required
- $9M
- Total budget
- $10M
- Stage
- Technology development (TRL 2)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.37
Printed circuit board hub
A new manufacturing facility for printed circuit boards.
- Financing required
- $5M
- Total budget
- $6M
- Stage
- Technology development (TRL 3)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.38
DC power converter
Scaling production of rugged, efficient power modules for unmanned and robotic systems.
- Financing required
- $4M
- Total budget
- $5M
- IRR
- 60%
- Payback
- 2.5 yrs
- Stage
- Technology development (TRL 7)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.39
Air Baby
A modular network of automated launchers with interceptor drones against mass drone attacks.
- Financing required
- $4M
- Total budget
- $40M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.40
Last Shadow T200
An automated interceptor platform that detects and destroys UAVs.
- Financing required
- $2.35M
- Total budget
- $34M
- Stage
- Technology development (TRL 8)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.41
Electronics Shelter
An underground manufacturing facility for UAVs and counter-UAV systems.
- Financing required
- $32M
- Total budget
- $32M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.42
Norda air defence system
A modular drone detection and interception system.
- Financing required
- $10M
- Total budget
- $15M
- Stage
- Technology development (TRL 6)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.43
Bluebird
Scaling autonomous counter-UAV systems, UAVs, EW and detectors.
- Financing required
- $10M
- Total budget
- $10M
- Stage
- Technology development (TRL 8)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.44
Highline-T
An airborne anti-drone shield that detects and suppresses UAVs.
- Financing required
- $4M
- Total budget
- $7M
- Stage
- Technology development (TRL 9)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.45
Modular protection of infrastructure facilities
Rapid-assembly modular structures shielding critical assets from aerial attacks.
- Financing required
- $3.3M
- Total budget
- $5.4M
- IRR
- 64.1%
- Payback
- 5 yrs
- Stage
- Technology development (TRL 6)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.46
Pluton
A passive ESM system for drone detection.
- Financing required
- $2.33M
- Total budget
- $3.5M
- Stage
- Technology development (TRL 8)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.47
Automated kinetic defence system
Thermal detection combined with automated kinetic countermeasures against UAVs.
- Financing required
- $1.5M
- Total budget
- $3.4M
- Stage
- Technology development (TRL 7)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.48
Gaarpia
Interceptor drone production plus training centres for air defence units.
- Financing required
- $2.1M
- Total budget
- $3M
- IRR
- 110%
- Payback
- 3 yrs
- Stage
- Technology development (TRL 7)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.49
Citadel
A multi-layer counter-UAS system of networked sensors and interceptor drones.
- Financing required
- $1.3M
- Total budget
- $2.5M
- Stage
- Technology development (TRL 6)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Defence techNo. 11.50
Wolly Antidrone
An AI drone detection system with an automated kinetic turret, now being upgraded.
- Financing required
- $1M
- Total budget
- $2M
- Stage
- Technology development (TRL 6)
- Ownership
- Private
- Region
- Ukraine, multiple regions
Investor questions
Who can invest in these projects?
Strategic investors, private companies, investment funds, banks and international financial institutions. Some projects seek equity, others debt or project finance, and a few assets are for sale outright.
What does IIO do after an investor enquiry?
We clarify your investment mandate, shortlist matching projects, check the sponsor and documents, prepare meetings and support the negotiations. Where a community or region is involved, we handle communication with local authorities.
Are there projects not listed here?
Yes. The catalogue shows only part of the projects we work with. For a specific mandate we search for sites and projects in communities and regions, including industrial parks.
How can I add my project?
Tell us about it on the Investor search page. We assess its readiness, help prepare the investment proposal and present it to investors.
For investors
Discuss a project with IIO
Leave your contact details and we will come back with project materials within two working days.